Document 1Table
Surveyor's allocation report (1 January 20X1)
Total price: 2,000,000. Land: 500,000. Building: 1,500,000, allocated as follows: structure 1,030,000, useful life 40 years, residual value 50,000; roof 150,000, 15 years; heating, ventilation and air-conditioning 180,000, 12 years; docks and automatic doors 120,000, 10 years; statutory safety inspection performed just before the purchase 20,000, valid for 5 years. Nil residual value for the other parts. Straight-line method for all parts.