Prepare and document a real IFRS workpaper from the documents of a file, as on an engagement.

How a mission works

Numbered sections, like a professional working paper: objective, data, pieces, analysis, calculations, entries, conclusion; then a reviewer reviews.

  1. 1Objective
  2. 2Data
  3. 3Documents
  4. 4Analysis
  5. 5Calculation
  6. 6Entries
  7. 7Judgment
  8. 8Conclusion
  9. 9References

868 missions

IAS 16 — Property, Plant and Equipment

L1Foundation(3)

L2Intermediate(5)

  • Intermediate

    Component approach

    Initial breakdown of the warehouse

    Logistics warehouse: components and replacement · Situation 1 of 3

    ≈ 45 min
  • Intermediate

    Component approach

    Replacement of the old system

    Logistics warehouse: components and replacement · Situation 2 of 3

    ≈ 45 min
  • Intermediate

    Component approach

    New safety inspection

    Logistics warehouse: components and replacement · Situation 3 of 3

    ≈ 45 min
  • Intermediate

    Depreciation calculation

    Annual charge 20X1 to 20X5

    Logistics warehouse: components and replacement · Situation 1 of 2

    ≈ 45 min
  • Intermediate

    Depreciation calculation

    20X6 charge after the replacements

    Logistics warehouse: components and replacement · Situation 2 of 2

    ≈ 45 min

L3Advanced(9)

  • Advanced

    Revaluation

    Hotel A — 31 December 20X3

    Hotels: the revaluation model over three years · Situation 1 of 7

    ≈ 60 min
  • Advanced

    Revaluation

    Hotel B — 31 December 20X3

    Hotels: the revaluation model over three years · Situation 2 of 7

    ≈ 60 min
  • Advanced

    Revaluation

    Hotel C — 31 December 20X3

    Hotels: the revaluation model over three years · Situation 3 of 7

    ≈ 60 min
  • Advanced

    Revaluation

    Hotel A — annual transfer from 20X4

    Hotels: the revaluation model over three years · Situation 4 of 7

    ≈ 60 min
  • Advanced

    Revaluation

    Hotel A — 31 December 20X5

    Hotels: the revaluation model over three years · Situation 5 of 7

    ≈ 60 min
  • Advanced

    Revaluation

    Hotel B — 31 December 20X5

    Hotels: the revaluation model over three years · Situation 6 of 7

    ≈ 60 min
  • Advanced

    Revaluation

    Hotel C — 31 December 20X5

    Hotels: the revaluation model over three years · Situation 7 of 7

    ≈ 60 min

L4Expert(13)

  • Expert

    Derecognition

    Flood, compensation and disposal of a production line

    ≈ 35 min
  • Expert

    Component approach

    Professional file: construction and commissioning of a production site

    ≈ 45 min
  • Expert

    Depreciation calculation

    Structure — 20X1 pro rata

    Professional file: construction and commissioning of a production site · Situation 1 of 5

    ≈ 45 min
  • Expert

    Depreciation calculation

    Roof — 20X1 pro rata

    Professional file: construction and commissioning of a production site · Situation 2 of 5

    ≈ 45 min
  • Expert

    Depreciation calculation

    Kiln body — 20X1 pro rata

    Professional file: construction and commissioning of a production site · Situation 3 of 5

    ≈ 45 min
  • Expert

    Depreciation calculation

    Refractory lining — 20X1 pro rata

    Professional file: construction and commissioning of a production site · Situation 4 of 5

    ≈ 45 min
  • Expert

    Depreciation calculation

    Whole site by component — 20X2

    Professional file: construction and commissioning of a production site · Situation 5 of 5

    ≈ 45 min
  • Expert

    Disclosure checklist

    Professional file: construction and commissioning of a production site

    ≈ 50 min

IAS 38 — Intangible Assets

L1Foundation(2)

L2Intermediate(1)

L3Advanced(2)

L4Expert(12)

  • Expert

    Revaluation model

    Revaluation at 31 December 20X1

    Transferable fishing quotas revalued, then sold · Situation 1 of 2

    ≈ 40 min
  • Expert

    Revaluation model

    Revaluation at 31 December 20X2

    Transferable fishing quotas revalued, then sold · Situation 2 of 2

    ≈ 40 min
  • Expert

    Derecognition

    Transferable fishing quotas revalued, then sold

    ≈ 30 min
  • Expert

    Useful life and amortisation

    Orion licence

    Professional file: year-end close of the intangible assets of a software publisher · Situation 1 of 4

    ≈ 40 min
  • Expert

    Useful life and amortisation

    Atlas module

    Professional file: year-end close of the intangible assets of a software publisher · Situation 2 of 4

    ≈ 40 min
  • Expert

    Useful life and amortisation

    Gamma licence

    Professional file: year-end close of the intangible assets of a software publisher · Situation 3 of 4

    ≈ 40 min
  • Expert

    Useful life and amortisation

    Delta licence

    Professional file: year-end close of the intangible assets of a software publisher · Situation 4 of 4

    ≈ 40 min
  • Expert

    Derecognition

    Professional file: year-end close of the intangible assets of a software publisher

    ≈ 30 min
  • Expert

    Intangible assets note

    Professional file: year-end close of the intangible assets of a software publisher

    ≈ 35 min

IAS 36 — Impairment of Assets

L1Foundation(3)

L2Intermediate(1)

L3Advanced(5)

L4Expert(18)

IFRS 16 — Leases

L1Foundation(2)

L2Intermediate(5)

L3Advanced(4)

L4Expert(16)

IAS 2 — Inventories

L1Foundation(3)

L2Intermediate(1)

L3Advanced(8)

L4Expert(29)

IFRS 15 — Revenue from Contracts with Customers

L1Foundation(4)

  • Foundation

    Allocating the transaction price

    Cold room

    Bundled cold room, installation and maintenance: five steps and allocation of the price · Situation 1 of 3

    ≈ 35 min
  • Foundation

    Allocating the transaction price

    Installation

    Bundled cold room, installation and maintenance: five steps and allocation of the price · Situation 2 of 3

    ≈ 35 min
  • Foundation

    Allocating the transaction price

    Maintenance

    Bundled cold room, installation and maintenance: five steps and allocation of the price · Situation 3 of 3

    ≈ 35 min

L2Intermediate(2)

  • Intermediate

    Specific arrangements

    Distributor: volume rebate, right of return and consideration payable to a customer

    ≈ 50 min

L3Advanced(6)

L4Expert(17)

  • Expert

    Specific arrangements

    Solvane Market marketplace

    Group revenue review: principal or agent, warranties, gift cards and disclosures · Situation 1 of 2

    ≈ 50 min
  • Expert

    Specific arrangements

    Gift cards

    Group revenue review: principal or agent, warranties, gift cards and disclosures · Situation 2 of 2

    ≈ 50 min
  • Expert

    Revenue note

    Group revenue review: principal or agent, warranties, gift cards and disclosures

    ≈ 35 min
  • Expert

    Determining the transaction price

    Kervalo acceptance bonus

    Professional file: revenue review of an industrial and services group · Situation 1 of 2

    ≈ 40 min
  • Expert

    Determining the transaction price

    Montclair deferred payment

    Professional file: revenue review of an industrial and services group · Situation 2 of 2

    ≈ 40 min
  • Expert

    Allocating the transaction price

    Brévannes — production line

    Professional file: revenue review of an industrial and services group · Situation 1 of 2

    ≈ 35 min
  • Expert

    Allocating the transaction price

    Brévannes — maintenance

    Professional file: revenue review of an industrial and services group · Situation 2 of 2

    ≈ 35 min
  • Expert

    Specific arrangements

    Third-party suppliers' parts

    Professional file: revenue review of an industrial and services group · Situation 1 of 2

    ≈ 50 min
  • Expert

    Specific arrangements

    Own-brand parts

    Professional file: revenue review of an industrial and services group · Situation 2 of 2

    ≈ 50 min
  • Expert

    Contract costs

    Professional file: revenue review of an industrial and services group

    ≈ 35 min
  • Expert

    Revenue note

    Professional file: revenue review of an industrial and services group

    ≈ 35 min

IAS 37 — Provisions, Contingent Liabilities and Contingent Assets

L1Foundation(5)

L2Intermediate(4)

  • Intermediate

    Measurement of the provision

    Track restoration

    Restoration of a quarry site: best estimate, discounting, unwinding and revision · Situation 1 of 3

    ≈ 40 min
  • Intermediate

    Measurement of the provision

    Dismantling — 1 January 20X1

    Restoration of a quarry site: best estimate, discounting, unwinding and revision · Situation 2 of 3

    ≈ 40 min
  • Intermediate

    Measurement of the provision

    Dismantling — 31 December 20X1

    Restoration of a quarry site: best estimate, discounting, unwinding and revision · Situation 3 of 3

    ≈ 40 min
  • Intermediate

    Provisions roll-forward

    Restoration of a quarry site: best estimate, discounting, unwinding and revision

    ≈ 45 min

L3Advanced(5)

  • Advanced

    Onerous contract review

    Narvelle supply contract

    Onerous supply contract: cost of fulfilling, exit penalty and prior impairment · Situation 1 of 3

    ≈ 40 min
  • Advanced

    Onerous contract review

    Ilbaro supply contract

    Onerous supply contract: cost of fulfilling, exit penalty and prior impairment · Situation 2 of 3

    ≈ 40 min
  • Advanced

    Onerous contract review

    Resin purchase order

    Onerous supply contract: cost of fulfilling, exit penalty and prior impairment · Situation 3 of 3

    ≈ 40 min
  • Advanced

    Restructuring provision

    Closure of the Plessac site

    Site closure: constructive obligation to restructure and eligible costs · Situation 1 of 2

    ≈ 40 min
  • Advanced

    Restructuring provision

    Iberian sales reorganisation

    Site closure: constructive obligation to restructure and eligible costs · Situation 2 of 2

    ≈ 40 min

L4Expert(27)

  • Expert

    Provisions roll-forward

    Warranties

    Year-end review of a group's provisions: reimbursements, movement schedule and contingency notes · Situation 1 of 4

    ≈ 45 min
  • Expert

    Provisions roll-forward

    Litigation

    Year-end review of a group's provisions: reimbursements, movement schedule and contingency notes · Situation 2 of 4

    ≈ 45 min
  • Expert

    Provisions roll-forward

    Environment

    Year-end review of a group's provisions: reimbursements, movement schedule and contingency notes · Situation 3 of 4

    ≈ 45 min
  • Expert

    Provisions roll-forward

    Restoration

    Year-end review of a group's provisions: reimbursements, movement schedule and contingency notes · Situation 4 of 4

    ≈ 45 min
  • Expert

    Note: provisions and contingencies

    Group note — provisions

    Year-end review of a group's provisions: reimbursements, movement schedule and contingency notes · Situation 1 of 3

    ≈ 35 min
  • Expert

    Note: provisions and contingencies

    Morvessan patent claim

    Year-end review of a group's provisions: reimbursements, movement schedule and contingency notes · Situation 2 of 3

    ≈ 35 min
  • Expert

    Note: provisions and contingencies

    Claim against Tarvenne Fret

    Year-end review of a group's provisions: reimbursements, movement schedule and contingency notes · Situation 3 of 3

    ≈ 35 min
  • Expert

    Measurement of the provision

    Merquin warranties

    Professional file: review of the provisions and contingencies of an industrial group · Situation 1 of 4

    ≈ 40 min
  • Expert

    Measurement of the provision

    Corvella dispute

    Professional file: review of the provisions and contingencies of an industrial group · Situation 2 of 4

    ≈ 40 min
  • Expert

    Measurement of the provision

    Quessandre clean-up

    Professional file: review of the provisions and contingencies of an industrial group · Situation 3 of 4

    ≈ 40 min
  • Expert

    Measurement of the provision

    Vellmont remediation

    Professional file: review of the provisions and contingencies of an industrial group · Situation 4 of 4

    ≈ 40 min
  • Expert

    Provisions roll-forward

    Warranties

    Professional file: review of the provisions and contingencies of an industrial group · Situation 1 of 5

    ≈ 45 min
  • Expert

    Provisions roll-forward

    Litigation

    Professional file: review of the provisions and contingencies of an industrial group · Situation 2 of 5

    ≈ 45 min
  • Expert

    Provisions roll-forward

    Environment

    Professional file: review of the provisions and contingencies of an industrial group · Situation 3 of 5

    ≈ 45 min
  • Expert

    Provisions roll-forward

    Restructuring

    Professional file: review of the provisions and contingencies of an industrial group · Situation 4 of 5

    ≈ 45 min
  • Expert

    Provisions roll-forward

    Onerous contracts

    Professional file: review of the provisions and contingencies of an industrial group · Situation 5 of 5

    ≈ 45 min
  • Expert

    Onerous contract review

    Professional file: review of the provisions and contingencies of an industrial group

    ≈ 40 min
  • Expert

    Restructuring provision

    Rocbrune closure

    Professional file: review of the provisions and contingencies of an industrial group · Situation 1 of 2

    ≈ 40 min
  • Expert

    Restructuring provision

    Junquera sale project

    Professional file: review of the provisions and contingencies of an industrial group · Situation 2 of 2

    ≈ 40 min
  • Expert

    Note: provisions and contingencies

    Group note — provisions

    Professional file: review of the provisions and contingencies of an industrial group · Situation 1 of 2

    ≈ 35 min
  • Expert

    Note: provisions and contingencies

    Note — Rocbrune inquiry

    Professional file: review of the provisions and contingencies of an industrial group · Situation 2 of 2

    ≈ 35 min

IAS 12 — Income Taxes

L1Foundation(2)

  • Foundation

    Current tax computation

    Current tax for 20X1

    From accounting profit to current tax: add-backs, instalments and carryback of a loss · Situation 1 of 2

    ≈ 35 min
  • Foundation

    Current tax computation

    20X2 tax loss carried back

    From accounting profit to current tax: add-backs, instalments and carryback of a loss · Situation 2 of 2

    ≈ 35 min

L2Intermediate(8)

  • Intermediate

    Temporary differences schedule

    Machine A

    Tax base schedule of an industrial SME: accelerated depreciation, development, provisions and revenue received in advance · Situation 1 of 8

    ≈ 40 min
  • Intermediate

    Temporary differences schedule

    Machine B

    Tax base schedule of an industrial SME: accelerated depreciation, development, provisions and revenue received in advance · Situation 2 of 8

    ≈ 40 min
  • Intermediate

    Temporary differences schedule

    Development costs

    Tax base schedule of an industrial SME: accelerated depreciation, development, provisions and revenue received in advance · Situation 3 of 8

    ≈ 40 min
  • Intermediate

    Temporary differences schedule

    Research costs

    Tax base schedule of an industrial SME: accelerated depreciation, development, provisions and revenue received in advance · Situation 4 of 8

    ≈ 40 min
  • Intermediate

    Temporary differences schedule

    Trade receivables

    Tax base schedule of an industrial SME: accelerated depreciation, development, provisions and revenue received in advance · Situation 5 of 8

    ≈ 40 min
  • Intermediate

    Temporary differences schedule

    Warranty provision

    Tax base schedule of an industrial SME: accelerated depreciation, development, provisions and revenue received in advance · Situation 6 of 8

    ≈ 40 min
  • Intermediate

    Temporary differences schedule

    Revenue received in advance

    Tax base schedule of an industrial SME: accelerated depreciation, development, provisions and revenue received in advance · Situation 7 of 8

    ≈ 40 min
  • Intermediate

    Temporary differences schedule

    Fine payable

    Tax base schedule of an industrial SME: accelerated depreciation, development, provisions and revenue received in advance · Situation 8 of 8

    ≈ 40 min

L3Advanced(12)

  • Advanced

    Temporary differences schedule

    Warehouse lease

    Lease, dismantling, licence, grant, goodwill and convertible bond: initial recognition exceptions · Situation 1 of 7

    ≈ 40 min
  • Advanced

    Temporary differences schedule

    Kiln subject to dismantling

    Lease, dismantling, licence, grant, goodwill and convertible bond: initial recognition exceptions · Situation 2 of 7

    ≈ 40 min
  • Advanced

    Temporary differences schedule

    Licence acquired

    Lease, dismantling, licence, grant, goodwill and convertible bond: initial recognition exceptions · Situation 3 of 7

    ≈ 40 min
  • Advanced

    Temporary differences schedule

    Grant received

    Lease, dismantling, licence, grant, goodwill and convertible bond: initial recognition exceptions · Situation 4 of 7

    ≈ 40 min
  • Advanced

    Temporary differences schedule

    Lantimar goodwill at acquisition

    Lease, dismantling, licence, grant, goodwill and convertible bond: initial recognition exceptions · Situation 5 of 7

    ≈ 40 min
  • Advanced

    Temporary differences schedule

    Lantimar goodwill at 31 December 20X4

    Lease, dismantling, licence, grant, goodwill and convertible bond: initial recognition exceptions · Situation 6 of 7

    ≈ 40 min
  • Advanced

    Temporary differences schedule

    Convertible bond

    Lease, dismantling, licence, grant, goodwill and convertible bond: initial recognition exceptions · Situation 7 of 7

    ≈ 40 min
  • Advanced

    Recoverability of deferred tax assets

    Ferrandine at 31 December 20X5

    Loss-making subsidiary: tax losses, convincing evidence, tax planning and reassessment · Situation 1 of 2

    ≈ 45 min
  • Advanced

    Recoverability of deferred tax assets

    Sorbiane Nord at 31 December 20X5

    Loss-making subsidiary: tax losses, convincing evidence, tax planning and reassessment · Situation 2 of 2

    ≈ 45 min
  • Advanced

    Deferred tax measurement and allocation

    Differences at the standard rate

    Rate change, revaluation, investment property, dividends and loss of a tax status: measuring and allocating tax · Situation 1 of 3

    ≈ 55 min
  • Advanced

    Deferred tax measurement and allocation

    Revalued land

    Rate change, revaluation, investment property, dividends and loss of a tax status: measuring and allocating tax · Situation 2 of 3

    ≈ 55 min
  • Advanced

    Deferred tax measurement and allocation

    Saint-Abeline warehouse

    Rate change, revaluation, investment property, dividends and loss of a tax status: measuring and allocating tax · Situation 3 of 3

    ≈ 55 min

L4Expert(23)

  • Expert

    Group deferred tax

    Kelmora (Ostralia) — business combination

    Acquisition of a foreign subsidiary: deferred tax on the combination, goodwill, investment, share option plan and offsetting · Situation 1 of 2

    ≈ 55 min
  • Expert

    Group deferred tax

    Sendrevia (Norvania) — losses and options

    Acquisition of a foreign subsidiary: deferred tax on the combination, goodwill, investment, share option plan and offsetting · Situation 2 of 2

    ≈ 55 min
  • Expert

    Uncertain tax treatments (IFRIC 23)

    Transfer pricing

    Tax closing of an international group: uncertain tax treatments, Pillar Two, components and reconciliation of tax expense · Situation 1 of 4

    ≈ 40 min
  • Expert

    Uncertain tax treatments (IFRIC 23)

    Former distributor indemnity

    Tax closing of an international group: uncertain tax treatments, Pillar Two, components and reconciliation of tax expense · Situation 2 of 4

    ≈ 40 min
  • Expert

    Uncertain tax treatments (IFRIC 23)

    Research tax credit

    Tax closing of an international group: uncertain tax treatments, Pillar Two, components and reconciliation of tax expense · Situation 3 of 4

    ≈ 40 min
  • Expert

    Uncertain tax treatments (IFRIC 23)

    Head office costs — 20X4 audit

    Tax closing of an international group: uncertain tax treatments, Pillar Two, components and reconciliation of tax expense · Situation 4 of 4

    ≈ 40 min
  • Expert

    Current tax computation

    Valdrise SA — 20X7 current tax

    Professional file: IFRS tax closing of an international industrial group · Situation 1 of 2

    ≈ 35 min
  • Expert

    Current tax computation

    Corvanne — carryback

    Professional file: IFRS tax closing of an international industrial group · Situation 2 of 2

    ≈ 35 min
  • Expert

    Temporary differences schedule

    Valdrise SA tooling

    Professional file: IFRS tax closing of an international industrial group · Situation 1 of 4

    ≈ 40 min
  • Expert

    Temporary differences schedule

    Warranty provision

    Professional file: IFRS tax closing of an international industrial group · Situation 2 of 4

    ≈ 40 min
  • Expert

    Temporary differences schedule

    Warehouse lease

    Professional file: IFRS tax closing of an international industrial group · Situation 3 of 4

    ≈ 40 min
  • Expert

    Temporary differences schedule

    Arlesque goodwill

    Professional file: IFRS tax closing of an international industrial group · Situation 4 of 4

    ≈ 40 min
  • Expert

    Group deferred tax

    Arlesque (Merovia) — business combination

    Professional file: IFRS tax closing of an international industrial group · Situation 1 of 4

    ≈ 55 min
  • Expert

    Group deferred tax

    Investment in Valdrise Vescaria

    Professional file: IFRS tax closing of an international industrial group · Situation 2 of 4

    ≈ 55 min
  • Expert

    Group deferred tax

    Valdrise SA (Lustrania) — share option plan

    Professional file: IFRS tax closing of an international industrial group · Situation 3 of 4

    ≈ 55 min
  • Expert

    Group deferred tax

    Corvanne (Cadoria) — offsetting

    Professional file: IFRS tax closing of an international industrial group · Situation 4 of 4

    ≈ 55 min
  • Expert

    Uncertain tax treatments (IFRIC 23)

    Transfer pricing — Vescaria

    Professional file: IFRS tax closing of an international industrial group · Situation 1 of 2

    ≈ 40 min

IFRS 9 — Financial Instruments

L1Foundation(4)

L2Intermediate(7)

L3Advanced(10)

L4Expert(17)

IAS 21 — The Effects of Changes in Foreign Exchange Rates

L1Foundation(2)

L2Intermediate(4)

L3Advanced(3)

L4Expert(11)

IAS 7 — Statement of Cash Flows

L1Foundation(16)

  • Foundation

    Cash flow classification matrix

    Loan instalment

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 1 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Lease rent

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 2 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Sale of a used truck

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 3 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Purchase of a minority stake

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 4 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Dividends paid

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 5 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Income tax instalments

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 6 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Money market fund placement

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 7 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Conversion of bonds into shares

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 8 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Loan instalment

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 1 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Lease rent

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 2 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Sale of a used truck

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 3 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Purchase of a minority stake

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 4 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Dividends paid

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 5 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Income tax instalments

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 6 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Money market fund placement

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 7 of 8

    ≈ 25 min
  • Foundation

    Cash flow classification matrix

    Conversion of bonds into shares

    Fifteen transactions to classify: operating, investing, financing or outside the statement · Situation 8 of 8

    ≈ 25 min

L2Intermediate(4)

L3Advanced(34)

L4Expert(38)

IAS 1 — Presentation of Financial Statements

L1Foundation(2)

L2Intermediate(2)

L3Advanced(9)

L4Expert(10)

IFRS 18 — Presentation and Disclosure in Financial Statements

L1Foundation(7)

L2Intermediate(1)

L3Advanced(10)

L4Expert(15)

IAS 8 — Accounting Policies, Changes in Accounting Estimates and Errors

L1Foundation(4)

  • Foundation

    Change classification matrix

    Change 1 — van useful life

    Policy, estimate or error? Reasoned sorting of ten changes in a distribution SME · Situation 1 of 3

    ≈ 30 min
  • Foundation

    Change classification matrix

    Change 4 — December 20X4 rent

    Policy, estimate or error? Reasoned sorting of ten changes in a distribution SME · Situation 2 of 3

    ≈ 30 min
  • Foundation

    Change classification matrix

    Change 9 — supplier dispute

    Policy, estimate or error? Reasoned sorting of ten changes in a distribution SME · Situation 3 of 3

    ≈ 30 min

L2Intermediate(2)

  • Intermediate

    IAS 8 disclosure checklist

    Provision omitted and discovered the following year: restatement of comparatives and tax effect

    ≈ 30 min

L3Advanced(4)

L4Expert(17)

  • Expert

    Accounting policy memo

    Group policy — certificates

    Transaction with no applicable standard: developing and documenting an accounting policy · Situation 1 of 2

    ≈ 40 min
  • Expert

    Accounting policy memo

    Halvenor Sud certificate purchases

    Transaction with no applicable standard: developing and documenting an accounting policy · Situation 2 of 2

    ≈ 40 min
  • Expert

    Change classification matrix

    Item (a) — loss allowance

    Receivables impairment: change in technique, revision of a provision or error? Classification and disclosure · Situation 1 of 3

    ≈ 30 min
  • Expert

    Change classification matrix

    Item (b) — returns provision

    Receivables impairment: change in technique, revision of a provision or error? Classification and disclosure · Situation 2 of 3

    ≈ 30 min
  • Expert

    Change classification matrix

    Item (c) — credit note of 26,000

    Receivables impairment: change in technique, revision of a provision or error? Classification and disclosure · Situation 3 of 3

    ≈ 30 min
  • Expert

    Change in estimate: prospective calculation

    Revision (a) — loss allowance

    Receivables impairment: change in technique, revision of a provision or error? Classification and disclosure · Situation 1 of 2

    ≈ 35 min
  • Expert

    Change in estimate: prospective calculation

    Revision (b) — returns provision

    Receivables impairment: change in technique, revision of a provision or error? Classification and disclosure · Situation 2 of 2

    ≈ 35 min
  • Expert

    Change classification matrix

    Point (a) — supplier rebates

    Review file of accounting changes and restatements of a retail group · Situation 1 of 4

    ≈ 30 min
  • Expert

    Change classification matrix

    Point (b) — cost formula

    Review file of accounting changes and restatements of a retail group · Situation 2 of 4

    ≈ 30 min
  • Expert

    Change classification matrix

    Point (d) — racking

    Review file of accounting changes and restatements of a retail group · Situation 3 of 4

    ≈ 30 min
  • Expert

    Change classification matrix

    Point (e) — carrier dispute

    Review file of accounting changes and restatements of a retail group · Situation 4 of 4

    ≈ 30 min
  • Expert

    Retrospective restatement schedule

    Vasquerel Jardin — 1 January 20X5

    Review file of accounting changes and restatements of a retail group · Situation 2 of 2

    ≈ 50 min
  • Expert

    Impracticability memo

    Review file of accounting changes and restatements of a retail group

    ≈ 45 min
  • Expert

    Accounting policy memo

    Review file of accounting changes and restatements of a retail group

    ≈ 40 min

IAS 10 — Events after the Reporting Period

L1Foundation(3)

  • Foundation

    Review of events after the reporting period

    Event 1 — Merlace liquidation

    Eight events between the reporting date and the approval of the statements: reasoned classification · Situation 1 of 3

    ≈ 35 min
  • Foundation

    Review of events after the reporting period

    Event 4 — dividend proposal

    Eight events between the reporting date and the approval of the statements: reasoned classification · Situation 3 of 3

    ≈ 35 min

L2Intermediate(5)

L3Advanced(2)

L4Expert(10)

IAS 19 — Employee Benefits

L1Foundation(1)

L3Advanced(2)

L4Expert(5)

IAS 20 — Accounting for Government Grants and Disclosure of Government Assistance

L2Intermediate(2)

L3Advanced(6)

L4Expert(6)

IAS 23 — Borrowing Costs

L1Foundation(1)

L2Intermediate(1)

L3Advanced(2)

L4Expert(9)

IAS 40 — Investment Property

L2Intermediate(1)

L3Advanced(11)

  • Advanced

    Classification and mixed-use file

    Building A — mixed use

    Mixed-use building and services to occupants: classification judgement · Situation 1 of 2

    ≈ 50 min
  • Advanced

    Classification and mixed-use file

    Building B — services to occupants

    Mixed-use building and services to occupants: classification judgement · Situation 2 of 2

    ≈ 50 min
  • Advanced

    Change in use transfer file

    Situation 1 — occupied building

    Change in use: transfers from an owner-occupied property and from inventory · Situation 1 of 5

    ≈ 55 min
  • Advanced

    Change in use transfer file

    Situation 2 — warehouse

    Change in use: transfers from an owner-occupied property and from inventory · Situation 2 of 5

    ≈ 55 min
  • Advanced

    Change in use transfer file

    Situation 3 — property held in inventory

    Change in use: transfers from an owner-occupied property and from inventory · Situation 3 of 5

    ≈ 55 min
  • Advanced

    Change in use transfer file

    Situation 4 — property occupied by the entity

    Change in use: transfers from an owner-occupied property and from inventory · Situation 4 of 5

    ≈ 55 min
  • Advanced

    Change in use transfer file

    Situation 5 — land

    Change in use: transfers from an owner-occupied property and from inventory · Situation 5 of 5

    ≈ 55 min

L4Expert(11)

IAS 24 — Related Party Disclosures

L1Foundation(1)

L2Intermediate(3)

L3Advanced(5)

L4Expert(15)

IAS 33 — Earnings per Share

L1Foundation(2)

L2Intermediate(4)

L3Advanced(6)

L4Expert(13)

IAS 34 — Interim Financial Reporting

L1Foundation(2)

L2Intermediate(2)

L3Advanced(7)

L4Expert(11)

IFRS 13 — Fair Value Measurement

L2Intermediate(1)

  • Intermediate

    Fair value measurement memo

    Principal market, most advantageous market, transaction and transport costs: Mécanor's hydraulic press

    ≈ 60 min

L3Advanced(2)

L4Expert(12)

IFRS 5 — Non-current Assets Held for Sale and Discontinued Operations

L1Foundation(5)

L2Intermediate(1)

L3Advanced(7)

L4Expert(13)

IFRS 2 — Share-based Payment

L1Foundation(2)

L2Intermediate(4)

L3Advanced(7)

L4Expert(11)

IAS 32 — Financial Instruments: Presentation

L1Foundation(4)

L2Intermediate(5)

L3Advanced(1)

L4Expert(13)

IFRS 7 — Financial Instruments: Disclosures

L1Foundation(2)

L2Intermediate(1)

L3Advanced(4)

L4Expert(6)

IFRS 3 — Business Combinations

L1Foundation(3)

L2Intermediate(2)

L3Advanced(14)

L4Expert(15)

IFRS 10 — Consolidated Financial Statements

L1Foundation(3)

L2Intermediate(5)

L3Advanced(4)

L4Expert(8)

IFRS 11 — Joint Arrangements

L1Foundation(2)

L2Intermediate(2)

L3Advanced(5)

L4Expert(6)

IFRS 12 — Disclosure of Interests in Other Entities

L1Foundation(2)

L2Intermediate(1)

L3Advanced(5)

L4Expert(7)

IAS 28 — Investments in Associates and Joint Ventures

L1Foundation(4)

L2Intermediate(3)

L3Advanced(3)

L4Expert(12)

IFRS 17 — Insurance Contracts

L2Intermediate(4)

L3Advanced(6)

L4Expert(12)