IFRS 13 · Workpapers (Step 4 of 5)
Workpaper assignment
- Course
- Exercises
- Case studies
- Workpapers
- Exams
Fair value measurement memo: Brenno site
Fair value measurement file of an industrial and financial group
Section 1 of 8
Objective
Section brief
- What to document
- The engagement, its scope and the working mode chosen.
- Why
- A workpaper answers one precise question: framing it avoids off-topic work.
- How
- Read the objective and the assignment, then choose the mode (guided, semi-guided, professional).
- Expected result
- You know which question the workpaper must settle, and for which reporting date.
- Your role
- Preparer of the IFRS 13 workpaper
- Level
- Expert
- Estimated time
- ≈ 60 min
- Progress
- 0 / 4 steps done (review excluded)
Context
Groupe Halvern (fictitious entity) combines an industrial division and a financial division. For the 31 December 20X5 closing, you prepare the fair value measurement file: copper lot, industrial site, warranty, level 3 instruments, an instrument acquired during the year and a derivatives portfolio. A reviewer will check the file and may ask questions. Teaching simulation: the review trail of the file (preparation, reviewer notes and final sign-off) is simulated for demonstration purposes; it is neither a real review nor a validation of the content.
Assignment
Fair value measurement memo
Purpose of the workpaper
For each item measured (one instance per item), describe the item and its unit of account, compare the markets available (net amount received, volume and activity), document the highest and best use of a non-financial asset (value under each use less conversion costs), reconcile the indications of the techniques (weighting, expected cash flow, present value), then justify the three judgements: reference market, highest and best use, unobservable inputs.
Questions of the file covered by this workpaper
- What is the principal market of the copper lot?
- Compute the net value of the site under each use.
- What is the value under the highest and best use?
- Compute the expected net exit price of the converted site.
- Discount it at the rate retained.
- Which indication should be retained for the site? Justify.
Documents in the file
Open the documents to pick out the relevant information.