Context · Dated fact of the file
Orvane Medical: from the lab to the VELA cardiac patch
Orvane Medical SA, a fictitious medical technology company (120 employees), year end 31 December.
IAS 38 · Case studies (Step 3 of 5)
Practical case
Orvane Medical SA, a fictitious medical technology company (120 employees), year end 31 December.
L1 · Guided · Year N-1 and beginning of year N
Orvane Medical is designing a connected patch, VELA, which monitors patients' heart rhythm at home and sends the data to the hospital. You follow the project from its initial research (year N-1) to its release for production (year N+1), first in a guided way, then as an auditor or a group reporting manager would. All figures are case data; teaching assumptions and professional judgements are flagged as such. Orvane applies the cost model to its intangible assets (case data).
Standard involved: IAS 38 Intangible Assets (internally generated projects). Before quantifying anything, you need to know in which phase each activity of the VELA project sits: the research phase and the development phase are not accounted for in the same way. Read the project log, then answer the three questions.
Fundamental level: the method, help and references are shown.
Method
File checklist
2 / 6 stages reached
Context · Dated fact of the file
Orvane Medical SA, a fictitious medical technology company (120 employees), year end 31 December.
Initial event · L1·Year N-1 and beginning of year N · Current stage
Standard involved: IAS 38 Intangible Assets (internally generated projects). Before quantifying anything, you need to know in which phase each activity of the VELA project sits: the research phase and the development phase are not accounted for in the same way. Read the project log, then answer the three questions.
Pieces added
New period · L2·Year N · Upcoming: unlocks after the current stage
New period · L3·Year N closing · Upcoming: unlocks after the current stage
New period · L4·Year N+1 · Upcoming: unlocks after the current stage
Conclusion · Upcoming: unlocks after the current stage
1 document to work from at this level.
Document 1Extract
First level: all the data is in the brief and the pieces of this level.
3 parts to answer, marked when you submit the level.
Find the useful facts in the pieces before concluding.
Part 1 · Classification · Recognition
Classify each activity of the VELA project in the right category.
Review of the scientific literature on sensing materials (N-1)
Comparison of three sensor technologies and final choice of the dry electrode
Design, construction and testing of the pre-production prototypes
Design of moulds using a new injection technique
Operation of a pilot line too small for profitable commercial production
Sales force training and launch advertising campaign
2 more questions will appear once the current question is complete.
Your working draft for this file: points noted, leads, intermediate calculations.
Saved on this device only; never graded.
Answer every part to submit the level and see the conclusion.
Normative references