Skip to main content
IFRS Academy

CERTYNEX IFRS ACADEMY

Search the Academy

Home
My learning path
Exercises & quizzes
Cases
Workpapers
Exams
My progress

Cross-IFRSCase studies (Step 3 of 5)

Practical case

Step 3 of 5
File · Progressive casePath L1 → L4L1 · Fundamental

Ondravex Civil Engineering: the Lunéard basin, a contract recognised over time amid inventories, plant and leases (N → N+2)

Ondravex Civil Engineering SA, a fictitious public works company specialising in hydraulic structures (420 employees, a fleet of owned and leased plant), IFRS financial statements, year end 31 December, amounts in euros excluding VAT unless stated otherwise.

3 documents5 tasks
0 / 5 tasks completed
Period
Year N — setting up the site (January to April N)
Standards
IFRS 15 — Revenue from Contracts with CustomersIAS 2 — InventoriesIAS 16 — Property, Plant and EquipmentIFRS 16 — Leases
Levels
0 / 4 levels validated
Current level
L1 · Guided≈ 90 min
Assistance levelFull guidance · strong assistance
  • Method: shown
  • Checklist: shown
  • Hints: shown
  • Step-by-step work: shown

Case brief

L1 · Guided · Year N — setting up the site (January to April N)

Level 1 — One contract, four standards: what governs what?

On 1 March N, Ondravex Civil Engineering signs a contract with the Régie des eaux du Val de Quilvane, a fictitious public water utility, to build a stormwater retention basin and its pumping station on land owned by the utility in Lunéard. To perform the work, Ondravex buys pipes that it stores in its depot, acquires a hydraulic excavator, uses a crane leased for three years and rents compactors for a few months. You follow the file over three years: setting up the site (level 1), year end N (level 2), amendment and year end N+1 (level 3), completion, disposal of plant and the N+2 notes (level 4). The case involves four standards: IFRS 15 for the contract, and IAS 2, IAS 16 and IFRS 16 for the resources used to perform it, to which IFRS 15 refers when they fall within another standard. From level 2 onwards, the applicable standards are no longer announced: you must identify them yourself. All figures are case data; teaching assumptions and professional judgements are flagged as such, and no method chosen by Ondravex is presented as required by a standard. Teaching assumption: amounts rounded to the euro, entries presented in summary form, tax effects ignored.

Standards involved: IFRS 15 Revenue from Contracts with Customers, IAS 2 Inventories, IAS 16 Property, Plant and Equipment and IFRS 16 Leases. Before measuring progress, you must know what the contract promises and which standard governs each of the resources used to perform it. Read the three documents, then answer in order: each question prepares the next.

Fundamental level: the method, help and references are shown.

Method

  1. Read the brief and the assignment.
  2. Open each document and spot the relevant data.
  3. Carry out the work in the suggested order.
  4. Submit, then read the conclusion and the model answer.

File checklist

  • Open each piece (0 / 3 consulted) · to do
  • Answer the questions of the level (0 / 5) · to do
  • Validate the level, then read the conclusion · to do

Events

The file, period by period

2 / 6 stages reached

  1. Context · Dated fact of the file

    Ondravex Civil Engineering: the Lunéard basin, a contract recognised over time amid inventories, plant and leases (N → N+2)

    Ondravex Civil Engineering SA, a fictitious public works company specialising in hydraulic structures (420 employees, a fleet of owned and leased plant), IFRS financial statements, year end 31 December, amounts in euros excluding VAT unless stated otherwise.

  2. Initial event · L1Year N — setting up the site (January to April N) · Current stage

    Level 1 — One contract, four standards: what governs what?

    Standards involved: IFRS 15 Revenue from Contracts with Customers, IAS 2 Inventories, IAS 16 Property, Plant and Equipment and IFRS 16 Leases. Before measuring progress, you must know what the contract promises and which standard governs each of the resources used to perform it. Read the three documents, then answer in order: each question prepares the next.

    Pieces added

    • Extract from the Ondravex – Régie des eaux du Val de Quilvane contract (case data)
    • Resources used for the site (case data)
    • Site budget at signature (case data)
  3. New period · L2Year N — year end at 31 December N · Upcoming: unlocks after the current stage

    Upcoming stage

  4. New period · L3Year N+1 — amendment of 1 April and year end at 31 December N+1 · Upcoming: unlocks after the current stage

    Upcoming stage

  5. New period · L4Year N+2 — completion, disposal, year end and notes at 31 December N+2 · Upcoming: unlocks after the current stage

    Upcoming stage

  6. Conclusion · Upcoming: unlocks after the current stage

    Upcoming stage

Documents

Case documents

3 documents to work from at this level.

Document 1Contract

Extract from the Ondravex – Régie des eaux du Val de Quilvane contract (case data)

  • Signature: written contract signed on 1 March N, approved by the utility's board; the criteria for the existence of a contract are met (case assumption, not discussed here).
  • Subject: detailed design and construction, on the utility's land in Lunéard, of an 18,000 m³ retention basin and an equipped pumping station (two pumps, electrical cabinet, discharge main). Ondravex integrates earthworks, civil works, equipment and networks into a single structure whose overall operation it guarantees.
  • Price: fixed lump-sum price of 12,000,000 excluding tax; VAT invoiced in addition.
  • Timetable: works from 1 March N to the end of March N+2 (planned acceptance).
  • Invoicing: advance of 10% (1,200,000) invoiced on signature, payable on 15 March N; then monthly progress statements based on the quantities approved by the utility's engineer, payable at 30 days.
  • Ownership and termination: the structure, built on the utility's land, belongs to it as it is constructed; the utility may terminate for convenience by paying for the work performed plus 10%.

Data

Facts of the file

Entity
Ondravex Civil Engineering SA, a fictitious public works company specialising in hydraulic structures (420 employees, a fleet of owned and leased plant), IFRS financial statements, year end 31 December, amounts in euros excluding VAT unless stated otherwise.
Period
Year N — setting up the site (January to April N)
Current level
L1 · Guided
Standards
IFRS 15 — Revenue from Contracts with Customers · IAS 2 — Inventories · IAS 16 — Property, Plant and Equipment · IFRS 16 — Leases

Pieces carried over from earlier levels

First level: all the data is in the brief and the pieces of this level.

Questions

5 parts to answer, marked when you submit the level.

  • Information to identify1
  • Analysis and judgement1
  • Calculations3

Information to identify

Find the useful facts in the pieces before concluding.

Part 1 · Classification · Recognition

Classify each item in the file according to the standard that primarily governs its accounting in Ondravex's books.

  1. The construction contract signed with the utility

  2. The cast-iron pipes held at the depot

  3. The purchased hydraulic excavator

  4. The crane leased for three years

  5. The compactors rented for five months

  6. The site mobilisation costs (192,000)

  7. The structure under construction on the utility's land

4 more questions will appear once the current question is complete.

Complete the question to continue.

Workspace

Your working draft for this file: points noted, leads, intermediate calculations.

Saved on this device only; never graded.

Conclusion

Answer every part to submit the level and see the conclusion.

Normative references

  • IFRS 15 §20
  • IFRS 15 §21
  • IFRS 15 §27
  • IFRS 15 §29
  • IFRS 15 §30
  • IFRS 15 §32
  • IFRS 15 §35
  • IFRS 15 §39
  • IFRS 15
  • IFRS 15 §43
  • IFRS 15 §95
  • IFRS 15 §97
  • IFRS 15 §99
  • IFRS 15 §105
  • IFRS 15 §106
  • IFRS 15 §107
  • IFRS 15 §108
  • IFRS 15 §116
  • IFRS 15 §124
  • IFRS 15 §128
  • IFRS 15 §B18
  • IFRS 15 §B19
  • IAS 2 §6
  • IAS 2
  • IAS 2 §9
  • IAS 2 §10
  • IAS 2 §11
  • IAS 2 §16
  • IAS 2 §28
  • IAS 2 §30
  • IAS 2 §32
  • IAS 2 §34
  • IAS 16 §6
  • IAS 16 §7
  • IAS 16 §16
  • IAS 16 §17
  • IAS 16 §19
  • IAS 16 §48
  • IAS 16 §53
  • IAS 16 §55
  • IAS 16 §68
  • IAS 16
  • IAS 16 §69
  • IAS 16 §71
  • IFRS 16 §5
  • IFRS 16 §6
  • IFRS 16 §8
  • IFRS 16 §22
  • IFRS 16 §24
  • IFRS 16 §26
  • IFRS 16 §31
  • IFRS 16 §32
  • IFRS 16 §36
  • IFRS 16 §37
  • IFRS 16 §38
  • IFRS 16 §49
  • IFRS 16 §53