Noirmont incurs 400,000 of fixed production overheads. Its normal capacity is 80,000 units, but a prolonged shutdown of a line due to a breakdown limited production to 50,000 units, an abnormally low level. The management controller included all fixed overheads in the cost of the units produced, at 8 per unit. What is the error?
Single choiceAdvancedPublished