Norvalia Énergie: a dryer financed by a public loan and a grant (N)

Norvalia Énergie SA, a fictitious company that produces biomass pellets (140 employees), IFRS financial statements, year end 31 December, amounts in euros.

1 document2 tasks
0 / 2 tasks completed
Period
Year N — 1 January
Standards
IAS 20 — Accounting for Government Grants and Disclosure of Government AssistanceIAS 23 — Borrowing Costs
Levels
0 / 4 levels validated
Current level
L1 · Guided≈ 45 min
Assistance levelFull guidance · strong assistance
  • Method: shown
  • Checklist: shown
  • Hints: shown
  • Step-by-step work: shown

Case brief

L1 · Guided · Year N — 1 January

Level 1 — The public loan and its components

You follow the construction of a dryer financed by a zero-rate public loan and an asset grant. For each item, two questions: which standard does it fall under, and what is its effect on the cost of the asset and on profit or loss? All amounts and the presentation policy are case data; the boundary between IAS 20 and IFRS 9 for the loan is given by the case. Case convention, not imposed by the standards: the benefit of the reduced rate does not reduce the expenditure used for the capitalisation of borrowing costs. Teaching assumption: income tax effects are ignored and the dryer is treated as a qualifying asset.

Measure the loan and classify the items of the project.

Fundamental level: the method, help and references are shown.

Method

  1. Read the brief and the assignment.
  2. Open each document and spot the relevant data.
  3. Carry out the work in the suggested order.
  4. Submit, then read the conclusion and the model answer.

File checklist

  • Open each piece (0 / 1 consulted) · to do
  • Answer the questions of the level (0 / 2) · to do
  • Validate the level, then read the conclusion · to do

Events

The file, period by period

2 / 6 stages reached

  1. Context · Dated fact of the file

    Norvalia Énergie: a dryer financed by a public loan and a grant (N)

    Norvalia Énergie SA, a fictitious company that produces biomass pellets (140 employees), IFRS financial statements, year end 31 December, amounts in euros.

  2. Initial event · L1Year N — 1 January · Current stage

    Level 1 — The public loan and its components

    Measure the loan and classify the items of the project.

    Pieces added

    • Document 1 — Project file (case data)
  3. New information · L2Year N — 1 January · Upcoming: unlocks after the current stage

    Upcoming stage

  4. New period · L3Year N — 31 December · Upcoming: unlocks after the current stage

    Upcoming stage

  5. New period · L4Year N — closing · Upcoming: unlocks after the current stage

    Upcoming stage

  6. Conclusion · Upcoming: unlocks after the current stage

    Upcoming stage

Documents

Case documents

1 document to work from at this level.

Document 1Supporting document

Document 1 — Project file (case data)

Item (case data)Information
Assetbiomass dryer, 12-month construction, ready for use on 31 December N; useful life 10 years, no residual value
Payment to the builder1,400,000 on 1 January N
Asset grant200,000 received on 1 January N from the ministry, conditions regarded as met
Public loan1,000,000 received on 1 January N, interest-free, repayable at maturity in 3 years; reference market rate 6%
Specific borrowingthe loan finances the dryer exclusively; no investment income
Company policygrant and rate benefit deducted from the carrying amount of the asset; the other presentation is studied for comparison

Data

Facts of the file

Entity
Norvalia Énergie SA, a fictitious company that produces biomass pellets (140 employees), IFRS financial statements, year end 31 December, amounts in euros.
Period
Year N — 1 January
Current level
L1 · Guided
Standards
IAS 20 — Accounting for Government Grants and Disclosure of Government Assistance · IAS 23 — Borrowing Costs

Pieces carried over from earlier levels

First level: all the data is in the brief and the pieces of this level.

Questions

2 parts to answer, marked when you submit the level.

  • Calculations1
  • Information to identify1

Calculations

Start from the data in the pieces, set the formula, check the unit and the order of magnitude.

3 of 3

Calculator

Click in an answer field to be able to insert the result.

Part 1 · Calculation

Measure the public loan at the date of receipt and compute the benefit of the below-market rate (amounts in EUR).

Data

Amount received (single repayment at maturity)
€1,000,000.00
Market rate
6%
Term
3 years
  1. €
  2. €

Checks

  • 0 / 2 steps entered
  • Amounts readable

Result: Benefit of the below-market rate

1 more question will appear once the current question is complete.

Complete the question to continue.

Workspace

Your working draft for this file: points noted, leads, intermediate calculations.

Saved on this device only; never graded.

Conclusion

Answer every part to submit the level and see the conclusion.

Normative references

  • IAS 20 §8
  • IAS 20 §10A
  • IAS 20 §12
  • IAS 20 §13
  • IAS 20 §24
  • IAS 20 §26
  • IAS 20 §27
  • IAS 23 §5
  • IAS 23 §8
  • IAS 23 §12
  • IAS 23 §18
  • IAS 23 §26
  • IAS 20 §25