WorkpaperIAS 16 — Property, Plant and EquipmentL1 · L2 · L3 · L4

Capitalised or expensed expenditure

2 missions10 sections to document45 min
Prepared by
AI-assisted draft
Reviewed by
Not reviewed — human review required
Status
Published

Objective of the workpaper

Classify each item of expenditure of an asset project between the cost of the asset and the expenses of the period, supporting the classification by the nature of the expenditure and the date the asset is capable of operating. For a self-constructed asset, complete the dedicated section. Totals and entries are calculated from the tables.

10 sections · 28 blocks · 3 calculations · 2 entries

  • IAS 16 §12
  • IAS 16 §16
  • IAS 16 §17
  • IAS 16 §19
  • IAS 16 §20
  • IAS 16 §21
  • IAS 16 §22
  • IAS 16 §20A

Work this workpaper as a mission

Each case that uses this template opens in the mission workspace: data, analysis, calculation, entries, conclusion and review, with your progress saved.

2 instances from the cases: the calculations and entries below are run by the calculation engine.

File and entity
Acquisition of a machining centre
Case task documented here
  • Determine the initial cost of the machine and the total expenditure to be recognised as an expense.
1

Inputs

Inputs
  • Project or asset concerned

    TextRequired

  • Date the asset is capable of operating as intended

    DateRequired

    20X1-04-01

  • Expenses settled in cash

    Number

    8,000

  • Expenses still payable

    Number

2

Supporting evidence

Evidence
  • Evidence obtained and referenced (category, document reference)

    EvidenceRequired

3

Classification of the expenditure

Analysis

IAS 16 §12IAS 16 §16IAS 16 §17IAS 16 §19IAS 16 §20AIAS 16 §21

  • Expenditure included in cost

    TableRequired

    6,000 | 9,000 | 14,000 | 3,000 | 5,000

  • Expenditure recognised as an expense

    Table

    4,000 | 2,500 | 1,500

  • Costs excluded from the cost of the asset

    Checklist

    • Opening a new facility
    • Introducing a new product or service, including advertising
    • Business in a new location or with a new class of customer, including staff training
    • Administration and other general overheads
    • Costs incurred once the asset is capable of operating
    • Incidental operations not necessary to bring the asset to working condition
    • Day-to-day servicing
  • Boundary between cost and expense

    JudgmentRequired

    Classification supported by the evidence / Classification to review (insufficient evidence)

  • Rationale: facts relied on, analysis, alternative rejected

    TextRequired

  • Proceeds and cost of items produced before intended use (recognised in profit or loss)

    Text

4

Totals

Calculations

IAS 16 §16IAS 16 §17IAS 16 §19

  • Total included in cost

    CalculationRequired

    37,000

    Expenditure included in cost

  • Total recognised as an expense

    Calculation

    8,000

    Expenditure recognised as an expense

5

Self-constructed asset

Calculations

IAS 16 §22

  • Materials

    Number

  • Direct labour

    Number

  • Directly attributable overheads

    Number

  • Borrowing costs capitalised under IAS 23

    Number

  • Internal profit to eliminate

    Number

  • Construction costs settled in cash

    Number

  • Construction costs still payable

    Number

  • Cost of the self-constructed asset

    Calculation

    0

    Materials ; Direct labour ; Directly attributable overheads ; Borrowing costs capitalised under IAS 23 ; − Internal profit to eliminate

6

Journal entries

Entries
  • Recognition of the expenditure not capitalised

    Entry

    AccountDebitCredit
    Expenses of the period8,000
    Payment8,000
  • Construction costs of the asset

    Entry

    Debit Asset under construction ← Cost of the self-constructed asset ; Credit Payment ← Construction costs settled in cash ; Credit Payables ← Construction costs still payable

7

Cessation of capitalisation

Judgment

IAS 16 §20

  • Date capitalisation ceases

    JudgmentRequired

    Date supported (commissioning, sign-off) / Date to review

  • Rationale: facts relied on, analysis, alternative rejected

    TextRequired

8

Conclusion

Conclusion
  • Conclusion on the amount capitalised and the expenses of the period

    ConclusionRequired

9

Impact on the financial statements

FS impact
  • Impact by heading, derived from the entries above (the Notes row points to the disclosures)

    TableRequired

10

Normative references

References
  • Paragraphs cited in this workpaper (verification status shown from the registry)

    References

11

Checks and financial statement impact

  • The total capitalised is determinedPass
  • The expense entry balancesPass
  • The construction entry balancesNot evaluated
Assets
-8,000
Liabilities
0
Profit or loss
-8,000
OCI
0
Equity
-8,000