Objective of the workpaper
Step 5: determine whether the obligation is satisfied over time or at a point in time, measure progress, account for contract modifications, calculate revenue for the period and the contract balance, then record the entries.
13 sections · 32 blocks · 4 calculations · 4 entries
- IFRS 15 §18
- IFRS 15 §19
- IFRS 15 §20
- IFRS 15 §21
- IFRS 15 §31
- IFRS 15 §32
- IFRS 15 §33
- IFRS 15
- IFRS 15 §35
- IFRS 15 §36
- IFRS 15 §37
- IFRS 15 §38
- IFRS 15 §39
- IFRS 15
- IFRS 15
- IFRS 15
- IFRS 15 §43
- IFRS 15 §44
- IFRS 15 §45
- IFRS 15 §105
- IFRS 15 §106
- IFRS 15 §107
- IFRS 15 §108
- IFRS 15 §B3
- IFRS 15 §B4
- IFRS 15 §B5
- IFRS 15
- IFRS 15
- IFRS 15 §B8
- IFRS 15 §B9
- IFRS 15 §B10
- IFRS 15 §B11
- IFRS 15 §B12
- IFRS 15 §B13
- IFRS 15
- IFRS 15
- IFRS 15 §B18
Work this workpaper as a mission
Each case that uses this template opens in the mission workspace: data, analysis, calculation, entries, conclusion and review, with your progress saved.
- Construction contract: cost-based progress, modification and contract assetOpen the mission · Year 20X1
- Construction contract: cost-based progress, modification and contract assetOpen the mission · Year 20X2 after modification
- Professional file: revenue review of an industrial and services groupOpen the mission · Brévannes line — 20X4
- Professional file: revenue review of an industrial and services groupOpen the mission · Kervalo contract — 20X4
- Professional file: revenue review of an industrial and services groupOpen the mission · Montclair delivery
5 instances from the cases: the calculations and entries below are run by the calculation engine.
- File and entity
- Construction contract: cost-based progress, modification and contract asset
- Case tasks documented here
- Calculate the cumulative revenue at the end of 20X1 and of 20X2.
- Calculate the revenue of each year.
- Calculate the contract balance at the end of 20X1 and of 20X2.
- Record the entries of the year 20X1.
- Record the entries of the year 20X2.
Inputs
InputsPerformance obligation followed (goods or services, place and manner of performance, termination and payment clauses)
TextRequired
Transaction price allocated to the obligation (after any modification)
NumberRequired
10,000,000
Total costs expected to satisfy the obligation (updated budget)
Number
8,000,000
Costs incurred at the reporting date that depict the entity's performance
Number
2,000,000
Exclude goods or services whose control is not transferred to the customer (para. 42). This workpaper does not restate the details on costs that do not depict performance.
Cumulative revenue recognised in prior periods
NumberRequired
0
Cumulative amounts invoiced or received at the reporting date
NumberRequired
2,000,000
Amounts invoiced in the period (right become unconditional)
Number
2,000,000
Advance received before the transfer of goods or services
Number
Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Number
Contract modification (change in scope or price, approval, goods or services added, agreed price)
Text
Supporting evidence
EvidenceEvidence obtained and referenced (category, document reference)
EvidenceRequired
Obligation satisfied over time
AnalysisIFRS 15 §31IFRS 15 §32IFRS 15 §33IFRS 15 §35IFRS 15 §36IFRS 15 §37IFRS 15 §B3IFRS 15 §B4IFRS 15 §B5IFRS 15IFRS 15IFRS 15 §B8IFRS 15 §B9IFRS 15 §B10IFRS 15 §B11IFRS 15 §B12IFRS 15 §B13
Criteria examined (one is enough)
ChecklistRequired
- Control: ability to direct the use of the asset and obtain substantially all of the remaining benefits
- The customer simultaneously receives and consumes the benefits as the entity performs (another entity would not need to re-perform the work completed)
- The performance creates or enhances an asset (tangible or intangible) that the customer controls as it is created
- Asset with no alternative use: substantive contractual restriction or practical limitation (significant economic losses), assessed at inception
- Enforceable right, at all times, to compensation approximating the selling price of the performance completed (costs incurred plus a reasonable margin, for example) if terminated for reasons other than the entity's failure to perform
- Determination made at inception; if no criterion is met, obligation satisfied at a point in time
Obligation satisfied at a point in time
AnalysisIFRS 15IFRS 15 §38
Indicators of the transfer of control
Checklist
- Entity's present right to payment
- Legal title held by the customer
- Physical possession by the customer
- Significant risks and rewards of ownership transferred to the customer
- Customer acceptance of the asset
- Any repurchase agreement taken into account (“Specific arrangements”)
Measuring progress
AnalysisIFRS 15 §39IFRS 15IFRS 15IFRS 15IFRS 15 §43IFRS 15 §44IFRS 15 §45IFRS 15IFRS 15IFRS 15 §B18
Measurement method examined
Checklist
- Objective: depict the entity's performance in transferring control
- A single method for each obligation, applied consistently and remeasured at each reporting date
- Output method (value transferred) or input method (efforts expended), depending on the nature of the good or service
- Goods or services whose control is not transferred excluded from the measure
- Update of progress: change in accounting estimate (IAS 8)
- Progress reasonably measurable; otherwise, revenue limited to the costs incurred that are expected to be recovered
Method for measuring progress retained
ChoiceRequired
Input: costs incurred relative to total expected costs
Input: costs incurred relative to total expected costs / Input: other measure (hours, time elapsed) / Output (surveys, milestones, units delivered) / Revenue to the extent of costs incurred (progress not reasonably measurable) / Not applicable: obligation satisfied at a point in time
The choice of method is a judgement based on the nature of the good or service (para. 41); the calculation below illustrates the cost-to-cost method. For another method, enter the corresponding measures instead of costs.
Contract modification
AnalysisIFRS 15 §18IFRS 15 §19IFRS 15 §20IFRS 15 §21
Analysis of the modification
Checklist
- Change in scope or price approved by the parties (even implicitly); otherwise, existing contract unchanged
- Scope approved without a price set: change estimated as variable consideration with the constraint
- Separate contract: addition of distinct goods or services at a price reflecting their stand-alone selling prices
- Remaining goods distinct: termination and new contract, prospectively
- Remaining goods not distinct from a partially satisfied obligation: cumulative catch-up adjustment to revenue
Contract balances
AnalysisIFRS 15 §105IFRS 15 §106IFRS 15 §107IFRS 15 §108
Presentation examined
ChecklistRequired
- Contract presented as a contract asset or liability depending on the relationship between performance and payment; unconditional right presented as a receivable
- Payment received or due before the transfer: contract liability
- Performance before payment or due date: contract asset (right conditional on something other than the passage of time)
- Receivable: right that is conditional only on the passage of time (IFRS 9)
Revenue for the period and contract balance
CalculationsIFRS 15 §21IFRS 15 §39IFRS 15IFRS 15 §B18IFRS 15 §105IFRS 15 §106IFRS 15 §107
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs)
Calculation
2,500,000
Transaction price allocated to the obligation (after any modification) ; Total costs expected to satisfy the obligation (updated budget) ; Costs incurred at the reporting date that depict the entity's performance
The calculation applies to the price and cumulative costs the generic engine amount × units / reference units. After a modification accounted for as a cumulative catch-up (para. 21), enter the revised price and budget: the difference with prior revenue includes the catch-up.
Revenue for the period (cumulative revenue − revenue of prior periods)
Calculation
2,500,000
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative revenue recognised in prior periods
Contract asset at the reporting date (cumulative revenue − amounts invoiced, if positive)
Calculation
500,000
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Contract liability at the reporting date (amounts invoiced − cumulative revenue, if positive)
Calculation
0
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Teaching assumption: the amounts invoiced are due or collected, so that the net position of the contract gives a contract asset or a contract liability (para. 105 to 107); amounts invoiced and not collected remain receivables.
Journal entries
EntriesRevenue for the period measured by progress
Entry
Account Debit Credit Contract asset 2,500,000 Revenue 2,500,000 Teaching assumption: revenue for the period is first recorded as a contract asset, then invoicing reclassifies it as a receivable; when there is an advance, revenue first reduces the contract liability.
Invoicing: reclassification as a receivable
Entry
Account Debit Credit Receivable 2,000,000 Contract asset 2,000,000 Advance received before the transfer
Entry
Debit Cash ← Advance received before the transfer of goods or services ; Credit Contract liability ← Advance received before the transfer of goods or services
Revenue from an obligation satisfied at a point in time, unconditional right
Entry
Debit Receivable ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant ; Credit Revenue ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Timing of recognition and modification
JudgmentIFRS 15 §18IFRS 15 §20IFRS 15 §21IFRS 15 §32IFRS 15 §35IFRS 15 §38
Manner in which the obligation is satisfied
JudgmentRequired
Over time: asset controlled by the customer
Over time: simultaneous receipt and consumption / Over time: asset controlled by the customer / Over time: no alternative use and enforceable right to payment / At a point in time: date of transfer of control according to the indicators
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Accounting for the modification
JudgmentRequired
No approved modification
Separate contract / Termination and new contract (prospective) / Cumulative catch-up adjustment to revenue / Combination of both approaches / No approved modification
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Conclusion
ConclusionTiming of recognition supported, revenue for the period, contract balance at the reporting date and entries
ConclusionRequired
Financial statement impact
FS impactImpact by caption, derived from the entries above (the Notes line refers to the disclosures)
TableRequired
Normative references
ReferencesParagraphs cited in this workpaper (verification status shown from the register)
References
Checks and financial statement impact
- The manner of satisfaction is documentedPass
- The accounting for modifications is documentedPass
- The measurement method is statedPass
- Cumulative revenue equals prior revenue plus revenue for the periodPass
- The revenue entry is balancedPass
- The invoicing entry is balancedPass
- The advance entry is balancedNot evaluated
- The point-in-time revenue entry is balancedNot evaluated
- Assets
- 2,500,000
- Liabilities
- 0
- Profit or loss
- 2,500,000
- OCI
- 0
- Equity
- 2,500,000
- File and entity
- Construction contract: cost-based progress, modification and contract asset
- Case tasks documented here
- Calculate the cumulative revenue at the end of 20X1 and of 20X2.
- Calculate the revenue of each year.
- Calculate the contract balance at the end of 20X1 and of 20X2.
- Record the entries of the year 20X1.
- Record the entries of the year 20X2.
Inputs
InputsPerformance obligation followed (goods or services, place and manner of performance, termination and payment clauses)
TextRequired
Transaction price allocated to the obligation (after any modification)
NumberRequired
11,200,000
Total costs expected to satisfy the obligation (updated budget)
Number
8,800,000
Costs incurred at the reporting date that depict the entity's performance
Number
5,500,000
Exclude goods or services whose control is not transferred to the customer (para. 42). This workpaper does not restate the details on costs that do not depict performance.
Cumulative revenue recognised in prior periods
NumberRequired
2,500,000
Cumulative amounts invoiced or received at the reporting date
NumberRequired
6,000,000
Amounts invoiced in the period (right become unconditional)
Number
4,000,000
Advance received before the transfer of goods or services
Number
Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Number
Contract modification (change in scope or price, approval, goods or services added, agreed price)
Text
Supporting evidence
EvidenceEvidence obtained and referenced (category, document reference)
EvidenceRequired
Obligation satisfied over time
AnalysisIFRS 15 §31IFRS 15 §32IFRS 15 §33IFRS 15 §35IFRS 15 §36IFRS 15 §37IFRS 15 §B3IFRS 15 §B4IFRS 15 §B5IFRS 15IFRS 15IFRS 15 §B8IFRS 15 §B9IFRS 15 §B10IFRS 15 §B11IFRS 15 §B12IFRS 15 §B13
Criteria examined (one is enough)
ChecklistRequired
- Control: ability to direct the use of the asset and obtain substantially all of the remaining benefits
- The customer simultaneously receives and consumes the benefits as the entity performs (another entity would not need to re-perform the work completed)
- The performance creates or enhances an asset (tangible or intangible) that the customer controls as it is created
- Asset with no alternative use: substantive contractual restriction or practical limitation (significant economic losses), assessed at inception
- Enforceable right, at all times, to compensation approximating the selling price of the performance completed (costs incurred plus a reasonable margin, for example) if terminated for reasons other than the entity's failure to perform
- Determination made at inception; if no criterion is met, obligation satisfied at a point in time
Obligation satisfied at a point in time
AnalysisIFRS 15IFRS 15 §38
Indicators of the transfer of control
Checklist
- Entity's present right to payment
- Legal title held by the customer
- Physical possession by the customer
- Significant risks and rewards of ownership transferred to the customer
- Customer acceptance of the asset
- Any repurchase agreement taken into account (“Specific arrangements”)
Measuring progress
AnalysisIFRS 15 §39IFRS 15IFRS 15IFRS 15IFRS 15 §43IFRS 15 §44IFRS 15 §45IFRS 15IFRS 15IFRS 15 §B18
Measurement method examined
Checklist
- Objective: depict the entity's performance in transferring control
- A single method for each obligation, applied consistently and remeasured at each reporting date
- Output method (value transferred) or input method (efforts expended), depending on the nature of the good or service
- Goods or services whose control is not transferred excluded from the measure
- Update of progress: change in accounting estimate (IAS 8)
- Progress reasonably measurable; otherwise, revenue limited to the costs incurred that are expected to be recovered
Method for measuring progress retained
ChoiceRequired
Input: costs incurred relative to total expected costs
Input: costs incurred relative to total expected costs / Input: other measure (hours, time elapsed) / Output (surveys, milestones, units delivered) / Revenue to the extent of costs incurred (progress not reasonably measurable) / Not applicable: obligation satisfied at a point in time
The choice of method is a judgement based on the nature of the good or service (para. 41); the calculation below illustrates the cost-to-cost method. For another method, enter the corresponding measures instead of costs.
Contract modification
AnalysisIFRS 15 §18IFRS 15 §19IFRS 15 §20IFRS 15 §21
Analysis of the modification
Checklist
- Change in scope or price approved by the parties (even implicitly); otherwise, existing contract unchanged
- Scope approved without a price set: change estimated as variable consideration with the constraint
- Separate contract: addition of distinct goods or services at a price reflecting their stand-alone selling prices
- Remaining goods distinct: termination and new contract, prospectively
- Remaining goods not distinct from a partially satisfied obligation: cumulative catch-up adjustment to revenue
Contract balances
AnalysisIFRS 15 §105IFRS 15 §106IFRS 15 §107IFRS 15 §108
Presentation examined
ChecklistRequired
- Contract presented as a contract asset or liability depending on the relationship between performance and payment; unconditional right presented as a receivable
- Payment received or due before the transfer: contract liability
- Performance before payment or due date: contract asset (right conditional on something other than the passage of time)
- Receivable: right that is conditional only on the passage of time (IFRS 9)
Revenue for the period and contract balance
CalculationsIFRS 15 §21IFRS 15 §39IFRS 15IFRS 15 §B18IFRS 15 §105IFRS 15 §106IFRS 15 §107
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs)
Calculation
7,000,000
Transaction price allocated to the obligation (after any modification) ; Total costs expected to satisfy the obligation (updated budget) ; Costs incurred at the reporting date that depict the entity's performance
The calculation applies to the price and cumulative costs the generic engine amount × units / reference units. After a modification accounted for as a cumulative catch-up (para. 21), enter the revised price and budget: the difference with prior revenue includes the catch-up.
Revenue for the period (cumulative revenue − revenue of prior periods)
Calculation
4,500,000
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative revenue recognised in prior periods
Contract asset at the reporting date (cumulative revenue − amounts invoiced, if positive)
Calculation
1,000,000
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Contract liability at the reporting date (amounts invoiced − cumulative revenue, if positive)
Calculation
0
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Teaching assumption: the amounts invoiced are due or collected, so that the net position of the contract gives a contract asset or a contract liability (para. 105 to 107); amounts invoiced and not collected remain receivables.
Journal entries
EntriesRevenue for the period measured by progress
Entry
Account Debit Credit Contract asset 4,500,000 Revenue 4,500,000 Teaching assumption: revenue for the period is first recorded as a contract asset, then invoicing reclassifies it as a receivable; when there is an advance, revenue first reduces the contract liability.
Invoicing: reclassification as a receivable
Entry
Account Debit Credit Receivable 4,000,000 Contract asset 4,000,000 Advance received before the transfer
Entry
Debit Cash ← Advance received before the transfer of goods or services ; Credit Contract liability ← Advance received before the transfer of goods or services
Revenue from an obligation satisfied at a point in time, unconditional right
Entry
Debit Receivable ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant ; Credit Revenue ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Timing of recognition and modification
JudgmentIFRS 15 §18IFRS 15 §20IFRS 15 §21IFRS 15 §32IFRS 15 §35IFRS 15 §38
Manner in which the obligation is satisfied
JudgmentRequired
Over time: asset controlled by the customer
Over time: simultaneous receipt and consumption / Over time: asset controlled by the customer / Over time: no alternative use and enforceable right to payment / At a point in time: date of transfer of control according to the indicators
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Accounting for the modification
JudgmentRequired
Cumulative catch-up adjustment to revenue
Separate contract / Termination and new contract (prospective) / Cumulative catch-up adjustment to revenue / Combination of both approaches / No approved modification
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Conclusion
ConclusionTiming of recognition supported, revenue for the period, contract balance at the reporting date and entries
ConclusionRequired
Financial statement impact
FS impactImpact by caption, derived from the entries above (the Notes line refers to the disclosures)
TableRequired
Normative references
ReferencesParagraphs cited in this workpaper (verification status shown from the register)
References
Checks and financial statement impact
- The manner of satisfaction is documentedPass
- The accounting for modifications is documentedPass
- The measurement method is statedPass
- Cumulative revenue equals prior revenue plus revenue for the periodPass
- The revenue entry is balancedPass
- The invoicing entry is balancedPass
- The advance entry is balancedNot evaluated
- The point-in-time revenue entry is balancedNot evaluated
- Assets
- 4,500,000
- Liabilities
- 0
- Profit or loss
- 4,500,000
- OCI
- 0
- Equity
- 4,500,000
- File and entity
- Professional file: revenue review of an industrial and services group
- Case tasks documented here
- Determine the timing of recognition, the treatment of the amendment and the principal or agent role.
- Calculate the revenue on the progress of the Brévannes and Kervalo contracts.
- Calculate the balance of each contract at the reporting date.
- Record the entries of the file.
Inputs
InputsPerformance obligation followed (goods or services, place and manner of performance, termination and payment clauses)
TextRequired
Transaction price allocated to the obligation (after any modification)
NumberRequired
4,700,000
Total costs expected to satisfy the obligation (updated budget)
Number
4,000,000
Costs incurred at the reporting date that depict the entity's performance
Number
2,800,000
Exclude goods or services whose control is not transferred to the customer (para. 42). This workpaper does not restate the details on costs that do not depict performance.
Cumulative revenue recognised in prior periods
NumberRequired
0
Cumulative amounts invoiced or received at the reporting date
NumberRequired
1,692,000
Amounts invoiced in the period (right become unconditional)
Number
1,692,000
Advance received before the transfer of goods or services
Number
Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Number
Contract modification (change in scope or price, approval, goods or services added, agreed price)
Text
Supporting evidence
EvidenceEvidence obtained and referenced (category, document reference)
EvidenceRequired
Obligation satisfied over time
AnalysisIFRS 15 §31IFRS 15 §32IFRS 15 §33IFRS 15 §35IFRS 15 §36IFRS 15 §37IFRS 15 §B3IFRS 15 §B4IFRS 15 §B5IFRS 15IFRS 15IFRS 15 §B8IFRS 15 §B9IFRS 15 §B10IFRS 15 §B11IFRS 15 §B12IFRS 15 §B13
Criteria examined (one is enough)
ChecklistRequired
- Control: ability to direct the use of the asset and obtain substantially all of the remaining benefits
- The customer simultaneously receives and consumes the benefits as the entity performs (another entity would not need to re-perform the work completed)
- The performance creates or enhances an asset (tangible or intangible) that the customer controls as it is created
- Asset with no alternative use: substantive contractual restriction or practical limitation (significant economic losses), assessed at inception
- Enforceable right, at all times, to compensation approximating the selling price of the performance completed (costs incurred plus a reasonable margin, for example) if terminated for reasons other than the entity's failure to perform
- Determination made at inception; if no criterion is met, obligation satisfied at a point in time
Obligation satisfied at a point in time
AnalysisIFRS 15IFRS 15 §38
Indicators of the transfer of control
Checklist
- Entity's present right to payment
- Legal title held by the customer
- Physical possession by the customer
- Significant risks and rewards of ownership transferred to the customer
- Customer acceptance of the asset
- Any repurchase agreement taken into account (“Specific arrangements”)
Measuring progress
AnalysisIFRS 15 §39IFRS 15IFRS 15IFRS 15IFRS 15 §43IFRS 15 §44IFRS 15 §45IFRS 15IFRS 15IFRS 15 §B18
Measurement method examined
Checklist
- Objective: depict the entity's performance in transferring control
- A single method for each obligation, applied consistently and remeasured at each reporting date
- Output method (value transferred) or input method (efforts expended), depending on the nature of the good or service
- Goods or services whose control is not transferred excluded from the measure
- Update of progress: change in accounting estimate (IAS 8)
- Progress reasonably measurable; otherwise, revenue limited to the costs incurred that are expected to be recovered
Method for measuring progress retained
ChoiceRequired
Input: costs incurred relative to total expected costs
Input: costs incurred relative to total expected costs / Input: other measure (hours, time elapsed) / Output (surveys, milestones, units delivered) / Revenue to the extent of costs incurred (progress not reasonably measurable) / Not applicable: obligation satisfied at a point in time
The choice of method is a judgement based on the nature of the good or service (para. 41); the calculation below illustrates the cost-to-cost method. For another method, enter the corresponding measures instead of costs.
Contract modification
AnalysisIFRS 15 §18IFRS 15 §19IFRS 15 §20IFRS 15 §21
Analysis of the modification
Checklist
- Change in scope or price approved by the parties (even implicitly); otherwise, existing contract unchanged
- Scope approved without a price set: change estimated as variable consideration with the constraint
- Separate contract: addition of distinct goods or services at a price reflecting their stand-alone selling prices
- Remaining goods distinct: termination and new contract, prospectively
- Remaining goods not distinct from a partially satisfied obligation: cumulative catch-up adjustment to revenue
Contract balances
AnalysisIFRS 15 §105IFRS 15 §106IFRS 15 §107IFRS 15 §108
Presentation examined
ChecklistRequired
- Contract presented as a contract asset or liability depending on the relationship between performance and payment; unconditional right presented as a receivable
- Payment received or due before the transfer: contract liability
- Performance before payment or due date: contract asset (right conditional on something other than the passage of time)
- Receivable: right that is conditional only on the passage of time (IFRS 9)
Revenue for the period and contract balance
CalculationsIFRS 15 §21IFRS 15 §39IFRS 15IFRS 15 §B18IFRS 15 §105IFRS 15 §106IFRS 15 §107
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs)
Calculation
3,290,000
Transaction price allocated to the obligation (after any modification) ; Total costs expected to satisfy the obligation (updated budget) ; Costs incurred at the reporting date that depict the entity's performance
The calculation applies to the price and cumulative costs the generic engine amount × units / reference units. After a modification accounted for as a cumulative catch-up (para. 21), enter the revised price and budget: the difference with prior revenue includes the catch-up.
Revenue for the period (cumulative revenue − revenue of prior periods)
Calculation
3,290,000
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative revenue recognised in prior periods
Contract asset at the reporting date (cumulative revenue − amounts invoiced, if positive)
Calculation
1,598,000
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Contract liability at the reporting date (amounts invoiced − cumulative revenue, if positive)
Calculation
0
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Teaching assumption: the amounts invoiced are due or collected, so that the net position of the contract gives a contract asset or a contract liability (para. 105 to 107); amounts invoiced and not collected remain receivables.
Journal entries
EntriesRevenue for the period measured by progress
Entry
Account Debit Credit Contract asset 3,290,000 Revenue 3,290,000 Teaching assumption: revenue for the period is first recorded as a contract asset, then invoicing reclassifies it as a receivable; when there is an advance, revenue first reduces the contract liability.
Invoicing: reclassification as a receivable
Entry
Account Debit Credit Receivable 1,692,000 Contract asset 1,692,000 Advance received before the transfer
Entry
Debit Cash ← Advance received before the transfer of goods or services ; Credit Contract liability ← Advance received before the transfer of goods or services
Revenue from an obligation satisfied at a point in time, unconditional right
Entry
Debit Receivable ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant ; Credit Revenue ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Timing of recognition and modification
JudgmentIFRS 15 §18IFRS 15 §20IFRS 15 §21IFRS 15 §32IFRS 15 §35IFRS 15 §38
Manner in which the obligation is satisfied
JudgmentRequired
Over time: no alternative use and enforceable right to payment
Over time: simultaneous receipt and consumption / Over time: asset controlled by the customer / Over time: no alternative use and enforceable right to payment / At a point in time: date of transfer of control according to the indicators
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Accounting for the modification
JudgmentRequired
No approved modification
Separate contract / Termination and new contract (prospective) / Cumulative catch-up adjustment to revenue / Combination of both approaches / No approved modification
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Conclusion
ConclusionTiming of recognition supported, revenue for the period, contract balance at the reporting date and entries
ConclusionRequired
Financial statement impact
FS impactImpact by caption, derived from the entries above (the Notes line refers to the disclosures)
TableRequired
Normative references
ReferencesParagraphs cited in this workpaper (verification status shown from the register)
References
Checks and financial statement impact
- The manner of satisfaction is documentedPass
- The accounting for modifications is documentedPass
- The measurement method is statedPass
- Cumulative revenue equals prior revenue plus revenue for the periodPass
- The revenue entry is balancedPass
- The invoicing entry is balancedPass
- The advance entry is balancedNot evaluated
- The point-in-time revenue entry is balancedNot evaluated
- Assets
- 3,290,000
- Liabilities
- 0
- Profit or loss
- 3,290,000
- OCI
- 0
- Equity
- 3,290,000
- File and entity
- Professional file: revenue review of an industrial and services group
- Case tasks documented here
- Determine the timing of recognition, the treatment of the amendment and the principal or agent role.
- Calculate the revenue on the progress of the Brévannes and Kervalo contracts.
- Calculate the balance of each contract at the reporting date.
- Record the entries of the file.
Inputs
InputsPerformance obligation followed (goods or services, place and manner of performance, termination and payment clauses)
TextRequired
Transaction price allocated to the obligation (after any modification)
NumberRequired
3,100,000
Total costs expected to satisfy the obligation (updated budget)
Number
2,500,000
Costs incurred at the reporting date that depict the entity's performance
Number
1,875,000
Exclude goods or services whose control is not transferred to the customer (para. 42). This workpaper does not restate the details on costs that do not depict performance.
Cumulative revenue recognised in prior periods
NumberRequired
650,000
Cumulative amounts invoiced or received at the reporting date
NumberRequired
1,970,000
Amounts invoiced in the period (right become unconditional)
Number
1,450,000
Advance received before the transfer of goods or services
Number
Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Number
Contract modification (change in scope or price, approval, goods or services added, agreed price)
Text
Supporting evidence
EvidenceEvidence obtained and referenced (category, document reference)
EvidenceRequired
Obligation satisfied over time
AnalysisIFRS 15 §31IFRS 15 §32IFRS 15 §33IFRS 15 §35IFRS 15 §36IFRS 15 §37IFRS 15 §B3IFRS 15 §B4IFRS 15 §B5IFRS 15IFRS 15IFRS 15 §B8IFRS 15 §B9IFRS 15 §B10IFRS 15 §B11IFRS 15 §B12IFRS 15 §B13
Criteria examined (one is enough)
ChecklistRequired
- Control: ability to direct the use of the asset and obtain substantially all of the remaining benefits
- The customer simultaneously receives and consumes the benefits as the entity performs (another entity would not need to re-perform the work completed)
- The performance creates or enhances an asset (tangible or intangible) that the customer controls as it is created
- Asset with no alternative use: substantive contractual restriction or practical limitation (significant economic losses), assessed at inception
- Enforceable right, at all times, to compensation approximating the selling price of the performance completed (costs incurred plus a reasonable margin, for example) if terminated for reasons other than the entity's failure to perform
- Determination made at inception; if no criterion is met, obligation satisfied at a point in time
Obligation satisfied at a point in time
AnalysisIFRS 15IFRS 15 §38
Indicators of the transfer of control
Checklist
- Entity's present right to payment
- Legal title held by the customer
- Physical possession by the customer
- Significant risks and rewards of ownership transferred to the customer
- Customer acceptance of the asset
- Any repurchase agreement taken into account (“Specific arrangements”)
Measuring progress
AnalysisIFRS 15 §39IFRS 15IFRS 15IFRS 15IFRS 15 §43IFRS 15 §44IFRS 15 §45IFRS 15IFRS 15IFRS 15 §B18
Measurement method examined
Checklist
- Objective: depict the entity's performance in transferring control
- A single method for each obligation, applied consistently and remeasured at each reporting date
- Output method (value transferred) or input method (efforts expended), depending on the nature of the good or service
- Goods or services whose control is not transferred excluded from the measure
- Update of progress: change in accounting estimate (IAS 8)
- Progress reasonably measurable; otherwise, revenue limited to the costs incurred that are expected to be recovered
Method for measuring progress retained
ChoiceRequired
Input: costs incurred relative to total expected costs
Input: costs incurred relative to total expected costs / Input: other measure (hours, time elapsed) / Output (surveys, milestones, units delivered) / Revenue to the extent of costs incurred (progress not reasonably measurable) / Not applicable: obligation satisfied at a point in time
The choice of method is a judgement based on the nature of the good or service (para. 41); the calculation below illustrates the cost-to-cost method. For another method, enter the corresponding measures instead of costs.
Contract modification
AnalysisIFRS 15 §18IFRS 15 §19IFRS 15 §20IFRS 15 §21
Analysis of the modification
Checklist
- Change in scope or price approved by the parties (even implicitly); otherwise, existing contract unchanged
- Scope approved without a price set: change estimated as variable consideration with the constraint
- Separate contract: addition of distinct goods or services at a price reflecting their stand-alone selling prices
- Remaining goods distinct: termination and new contract, prospectively
- Remaining goods not distinct from a partially satisfied obligation: cumulative catch-up adjustment to revenue
Contract balances
AnalysisIFRS 15 §105IFRS 15 §106IFRS 15 §107IFRS 15 §108
Presentation examined
ChecklistRequired
- Contract presented as a contract asset or liability depending on the relationship between performance and payment; unconditional right presented as a receivable
- Payment received or due before the transfer: contract liability
- Performance before payment or due date: contract asset (right conditional on something other than the passage of time)
- Receivable: right that is conditional only on the passage of time (IFRS 9)
Revenue for the period and contract balance
CalculationsIFRS 15 §21IFRS 15 §39IFRS 15IFRS 15 §B18IFRS 15 §105IFRS 15 §106IFRS 15 §107
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs)
Calculation
2,325,000
Transaction price allocated to the obligation (after any modification) ; Total costs expected to satisfy the obligation (updated budget) ; Costs incurred at the reporting date that depict the entity's performance
The calculation applies to the price and cumulative costs the generic engine amount × units / reference units. After a modification accounted for as a cumulative catch-up (para. 21), enter the revised price and budget: the difference with prior revenue includes the catch-up.
Revenue for the period (cumulative revenue − revenue of prior periods)
Calculation
1,675,000
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative revenue recognised in prior periods
Contract asset at the reporting date (cumulative revenue − amounts invoiced, if positive)
Calculation
355,000
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Contract liability at the reporting date (amounts invoiced − cumulative revenue, if positive)
Calculation
0
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Teaching assumption: the amounts invoiced are due or collected, so that the net position of the contract gives a contract asset or a contract liability (para. 105 to 107); amounts invoiced and not collected remain receivables.
Journal entries
EntriesRevenue for the period measured by progress
Entry
Account Debit Credit Contract asset 1,675,000 Revenue 1,675,000 Teaching assumption: revenue for the period is first recorded as a contract asset, then invoicing reclassifies it as a receivable; when there is an advance, revenue first reduces the contract liability.
Invoicing: reclassification as a receivable
Entry
Account Debit Credit Receivable 1,450,000 Contract asset 1,450,000 Advance received before the transfer
Entry
Debit Cash ← Advance received before the transfer of goods or services ; Credit Contract liability ← Advance received before the transfer of goods or services
Revenue from an obligation satisfied at a point in time, unconditional right
Entry
Debit Receivable ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant ; Credit Revenue ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Timing of recognition and modification
JudgmentIFRS 15 §18IFRS 15 §20IFRS 15 §21IFRS 15 §32IFRS 15 §35IFRS 15 §38
Manner in which the obligation is satisfied
JudgmentRequired
Over time: asset controlled by the customer
Over time: simultaneous receipt and consumption / Over time: asset controlled by the customer / Over time: no alternative use and enforceable right to payment / At a point in time: date of transfer of control according to the indicators
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Accounting for the modification
JudgmentRequired
Cumulative catch-up adjustment to revenue
Separate contract / Termination and new contract (prospective) / Cumulative catch-up adjustment to revenue / Combination of both approaches / No approved modification
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Conclusion
ConclusionTiming of recognition supported, revenue for the period, contract balance at the reporting date and entries
ConclusionRequired
Financial statement impact
FS impactImpact by caption, derived from the entries above (the Notes line refers to the disclosures)
TableRequired
Normative references
ReferencesParagraphs cited in this workpaper (verification status shown from the register)
References
Checks and financial statement impact
- The manner of satisfaction is documentedPass
- The accounting for modifications is documentedPass
- The measurement method is statedPass
- Cumulative revenue equals prior revenue plus revenue for the periodPass
- The revenue entry is balancedPass
- The invoicing entry is balancedPass
- The advance entry is balancedNot evaluated
- The point-in-time revenue entry is balancedNot evaluated
- Assets
- 1,675,000
- Liabilities
- 0
- Profit or loss
- 1,675,000
- OCI
- 0
- Equity
- 1,675,000
- File and entity
- Professional file: revenue review of an industrial and services group
- Case tasks documented here
- Determine the timing of recognition, the treatment of the amendment and the principal or agent role.
- Calculate the revenue on the progress of the Brévannes and Kervalo contracts.
- Calculate the balance of each contract at the reporting date.
- Record the entries of the file.
Inputs
InputsPerformance obligation followed (goods or services, place and manner of performance, termination and payment clauses)
TextRequired
Transaction price allocated to the obligation (after any modification)
NumberRequired
Total costs expected to satisfy the obligation (updated budget)
Number
Costs incurred at the reporting date that depict the entity's performance
Number
Exclude goods or services whose control is not transferred to the customer (para. 42). This workpaper does not restate the details on costs that do not depict performance.
Cumulative revenue recognised in prior periods
NumberRequired
Cumulative amounts invoiced or received at the reporting date
NumberRequired
Amounts invoiced in the period (right become unconditional)
Number
Advance received before the transfer of goods or services
Number
Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Number
1,300,000
Contract modification (change in scope or price, approval, goods or services added, agreed price)
Text
Supporting evidence
EvidenceEvidence obtained and referenced (category, document reference)
EvidenceRequired
Obligation satisfied over time
AnalysisIFRS 15 §31IFRS 15 §32IFRS 15 §33IFRS 15 §35IFRS 15 §36IFRS 15 §37IFRS 15 §B3IFRS 15 §B4IFRS 15 §B5IFRS 15IFRS 15IFRS 15 §B8IFRS 15 §B9IFRS 15 §B10IFRS 15 §B11IFRS 15 §B12IFRS 15 §B13
Criteria examined (one is enough)
ChecklistRequired
- Control: ability to direct the use of the asset and obtain substantially all of the remaining benefits
- The customer simultaneously receives and consumes the benefits as the entity performs (another entity would not need to re-perform the work completed)
- The performance creates or enhances an asset (tangible or intangible) that the customer controls as it is created
- Asset with no alternative use: substantive contractual restriction or practical limitation (significant economic losses), assessed at inception
- Enforceable right, at all times, to compensation approximating the selling price of the performance completed (costs incurred plus a reasonable margin, for example) if terminated for reasons other than the entity's failure to perform
- Determination made at inception; if no criterion is met, obligation satisfied at a point in time
Obligation satisfied at a point in time
AnalysisIFRS 15IFRS 15 §38
Indicators of the transfer of control
Checklist
- Entity's present right to payment
- Legal title held by the customer
- Physical possession by the customer
- Significant risks and rewards of ownership transferred to the customer
- Customer acceptance of the asset
- Any repurchase agreement taken into account (“Specific arrangements”)
Measuring progress
AnalysisIFRS 15 §39IFRS 15IFRS 15IFRS 15IFRS 15 §43IFRS 15 §44IFRS 15 §45IFRS 15IFRS 15IFRS 15 §B18
Measurement method examined
Checklist
- Objective: depict the entity's performance in transferring control
- A single method for each obligation, applied consistently and remeasured at each reporting date
- Output method (value transferred) or input method (efforts expended), depending on the nature of the good or service
- Goods or services whose control is not transferred excluded from the measure
- Update of progress: change in accounting estimate (IAS 8)
- Progress reasonably measurable; otherwise, revenue limited to the costs incurred that are expected to be recovered
Method for measuring progress retained
ChoiceRequired
Not applicable: obligation satisfied at a point in time
Input: costs incurred relative to total expected costs / Input: other measure (hours, time elapsed) / Output (surveys, milestones, units delivered) / Revenue to the extent of costs incurred (progress not reasonably measurable) / Not applicable: obligation satisfied at a point in time
The choice of method is a judgement based on the nature of the good or service (para. 41); the calculation below illustrates the cost-to-cost method. For another method, enter the corresponding measures instead of costs.
Contract modification
AnalysisIFRS 15 §18IFRS 15 §19IFRS 15 §20IFRS 15 §21
Analysis of the modification
Checklist
- Change in scope or price approved by the parties (even implicitly); otherwise, existing contract unchanged
- Scope approved without a price set: change estimated as variable consideration with the constraint
- Separate contract: addition of distinct goods or services at a price reflecting their stand-alone selling prices
- Remaining goods distinct: termination and new contract, prospectively
- Remaining goods not distinct from a partially satisfied obligation: cumulative catch-up adjustment to revenue
Contract balances
AnalysisIFRS 15 §105IFRS 15 §106IFRS 15 §107IFRS 15 §108
Presentation examined
ChecklistRequired
- Contract presented as a contract asset or liability depending on the relationship between performance and payment; unconditional right presented as a receivable
- Payment received or due before the transfer: contract liability
- Performance before payment or due date: contract asset (right conditional on something other than the passage of time)
- Receivable: right that is conditional only on the passage of time (IFRS 9)
Revenue for the period and contract balance
CalculationsIFRS 15 §21IFRS 15 §39IFRS 15IFRS 15 §B18IFRS 15 §105IFRS 15 §106IFRS 15 §107
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs)
Calculation
Transaction price allocated to the obligation (after any modification) ; Total costs expected to satisfy the obligation (updated budget) ; Costs incurred at the reporting date that depict the entity's performance
The calculation applies to the price and cumulative costs the generic engine amount × units / reference units. After a modification accounted for as a cumulative catch-up (para. 21), enter the revised price and budget: the difference with prior revenue includes the catch-up.
Revenue for the period (cumulative revenue − revenue of prior periods)
Calculation
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative revenue recognised in prior periods
Contract asset at the reporting date (cumulative revenue − amounts invoiced, if positive)
Calculation
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Contract liability at the reporting date (amounts invoiced − cumulative revenue, if positive)
Calculation
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Teaching assumption: the amounts invoiced are due or collected, so that the net position of the contract gives a contract asset or a contract liability (para. 105 to 107); amounts invoiced and not collected remain receivables.
Journal entries
EntriesRevenue for the period measured by progress
Entry
Debit Contract asset ← Revenue for the period (cumulative revenue − revenue of prior periods) ; Credit Revenue ← Revenue for the period (cumulative revenue − revenue of prior periods)
Teaching assumption: revenue for the period is first recorded as a contract asset, then invoicing reclassifies it as a receivable; when there is an advance, revenue first reduces the contract liability.
Invoicing: reclassification as a receivable
Entry
Debit Receivable ← Amounts invoiced in the period (right become unconditional) ; Credit Contract asset ← Amounts invoiced in the period (right become unconditional)
Advance received before the transfer
Entry
Debit Cash ← Advance received before the transfer of goods or services ; Credit Contract liability ← Advance received before the transfer of goods or services
Revenue from an obligation satisfied at a point in time, unconditional right
Entry
Account Debit Credit Receivable 1,300,000 Revenue 1,300,000
Timing of recognition and modification
JudgmentIFRS 15 §18IFRS 15 §20IFRS 15 §21IFRS 15 §32IFRS 15 §35IFRS 15 §38
Manner in which the obligation is satisfied
JudgmentRequired
At a point in time: date of transfer of control according to the indicators
Over time: simultaneous receipt and consumption / Over time: asset controlled by the customer / Over time: no alternative use and enforceable right to payment / At a point in time: date of transfer of control according to the indicators
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Accounting for the modification
JudgmentRequired
No approved modification
Separate contract / Termination and new contract (prospective) / Cumulative catch-up adjustment to revenue / Combination of both approaches / No approved modification
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Conclusion
ConclusionTiming of recognition supported, revenue for the period, contract balance at the reporting date and entries
ConclusionRequired
Financial statement impact
FS impactImpact by caption, derived from the entries above (the Notes line refers to the disclosures)
TableRequired
Normative references
ReferencesParagraphs cited in this workpaper (verification status shown from the register)
References
Checks and financial statement impact
- The manner of satisfaction is documentedPass
- The accounting for modifications is documentedPass
- The measurement method is statedPass
- Cumulative revenue equals prior revenue plus revenue for the periodNot evaluated
- The revenue entry is balancedNot evaluated
- The invoicing entry is balancedNot evaluated
- The advance entry is balancedNot evaluated
- The point-in-time revenue entry is balancedPass
- Assets
- 1,300,000
- Liabilities
- 0
- Profit or loss
- 1,300,000
- OCI
- 0
- Equity
- 1,300,000
Inputs
InputsPerformance obligation followed (goods or services, place and manner of performance, termination and payment clauses)
TextRequired
Transaction price allocated to the obligation (after any modification)
NumberRequired
Total costs expected to satisfy the obligation (updated budget)
Number
Costs incurred at the reporting date that depict the entity's performance
Number
Exclude goods or services whose control is not transferred to the customer (para. 42). This workpaper does not restate the details on costs that do not depict performance.
Cumulative revenue recognised in prior periods
NumberRequired
Cumulative amounts invoiced or received at the reporting date
NumberRequired
Amounts invoiced in the period (right become unconditional)
Number
Advance received before the transfer of goods or services
Number
Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Number
Contract modification (change in scope or price, approval, goods or services added, agreed price)
Text
Supporting evidence
EvidenceEvidence obtained and referenced (category, document reference)
EvidenceRequired
Obligation satisfied over time
AnalysisIFRS 15 §31IFRS 15 §32IFRS 15 §33IFRS 15 §35IFRS 15 §36IFRS 15 §37IFRS 15 §B3IFRS 15 §B4IFRS 15 §B5IFRS 15IFRS 15IFRS 15 §B8IFRS 15 §B9IFRS 15 §B10IFRS 15 §B11IFRS 15 §B12IFRS 15 §B13
Criteria examined (one is enough)
ChecklistRequired
- Control: ability to direct the use of the asset and obtain substantially all of the remaining benefits
- The customer simultaneously receives and consumes the benefits as the entity performs (another entity would not need to re-perform the work completed)
- The performance creates or enhances an asset (tangible or intangible) that the customer controls as it is created
- Asset with no alternative use: substantive contractual restriction or practical limitation (significant economic losses), assessed at inception
- Enforceable right, at all times, to compensation approximating the selling price of the performance completed (costs incurred plus a reasonable margin, for example) if terminated for reasons other than the entity's failure to perform
- Determination made at inception; if no criterion is met, obligation satisfied at a point in time
Obligation satisfied at a point in time
AnalysisIFRS 15IFRS 15 §38
Indicators of the transfer of control
Checklist
- Entity's present right to payment
- Legal title held by the customer
- Physical possession by the customer
- Significant risks and rewards of ownership transferred to the customer
- Customer acceptance of the asset
- Any repurchase agreement taken into account (“Specific arrangements”)
Measuring progress
AnalysisIFRS 15 §39IFRS 15IFRS 15IFRS 15IFRS 15 §43IFRS 15 §44IFRS 15 §45IFRS 15IFRS 15IFRS 15 §B18
Measurement method examined
Checklist
- Objective: depict the entity's performance in transferring control
- A single method for each obligation, applied consistently and remeasured at each reporting date
- Output method (value transferred) or input method (efforts expended), depending on the nature of the good or service
- Goods or services whose control is not transferred excluded from the measure
- Update of progress: change in accounting estimate (IAS 8)
- Progress reasonably measurable; otherwise, revenue limited to the costs incurred that are expected to be recovered
Method for measuring progress retained
ChoiceRequired
Input: costs incurred relative to total expected costs / Input: other measure (hours, time elapsed) / Output (surveys, milestones, units delivered) / Revenue to the extent of costs incurred (progress not reasonably measurable) / Not applicable: obligation satisfied at a point in time
The choice of method is a judgement based on the nature of the good or service (para. 41); the calculation below illustrates the cost-to-cost method. For another method, enter the corresponding measures instead of costs.
Contract modification
AnalysisIFRS 15 §18IFRS 15 §19IFRS 15 §20IFRS 15 §21
Analysis of the modification
Checklist
- Change in scope or price approved by the parties (even implicitly); otherwise, existing contract unchanged
- Scope approved without a price set: change estimated as variable consideration with the constraint
- Separate contract: addition of distinct goods or services at a price reflecting their stand-alone selling prices
- Remaining goods distinct: termination and new contract, prospectively
- Remaining goods not distinct from a partially satisfied obligation: cumulative catch-up adjustment to revenue
Contract balances
AnalysisIFRS 15 §105IFRS 15 §106IFRS 15 §107IFRS 15 §108
Presentation examined
ChecklistRequired
- Contract presented as a contract asset or liability depending on the relationship between performance and payment; unconditional right presented as a receivable
- Payment received or due before the transfer: contract liability
- Performance before payment or due date: contract asset (right conditional on something other than the passage of time)
- Receivable: right that is conditional only on the passage of time (IFRS 9)
Revenue for the period and contract balance
CalculationsIFRS 15 §21IFRS 15 §39IFRS 15IFRS 15 §B18IFRS 15 §105IFRS 15 §106IFRS 15 §107
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs)
Calculation
Transaction price allocated to the obligation (after any modification) ; Total costs expected to satisfy the obligation (updated budget) ; Costs incurred at the reporting date that depict the entity's performance
The calculation applies to the price and cumulative costs the generic engine amount × units / reference units. After a modification accounted for as a cumulative catch-up (para. 21), enter the revised price and budget: the difference with prior revenue includes the catch-up.
Revenue for the period (cumulative revenue − revenue of prior periods)
Calculation
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative revenue recognised in prior periods
Contract asset at the reporting date (cumulative revenue − amounts invoiced, if positive)
Calculation
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Contract liability at the reporting date (amounts invoiced − cumulative revenue, if positive)
Calculation
Cumulative revenue at the reporting date (allocated price × costs incurred / total expected costs) ; − Cumulative amounts invoiced or received at the reporting date
Teaching assumption: the amounts invoiced are due or collected, so that the net position of the contract gives a contract asset or a contract liability (para. 105 to 107); amounts invoiced and not collected remain receivables.
Journal entries
EntriesRevenue for the period measured by progress
Entry
Debit Contract asset ← Revenue for the period (cumulative revenue − revenue of prior periods) ; Credit Revenue ← Revenue for the period (cumulative revenue − revenue of prior periods)
Teaching assumption: revenue for the period is first recorded as a contract asset, then invoicing reclassifies it as a receivable; when there is an advance, revenue first reduces the contract liability.
Invoicing: reclassification as a receivable
Entry
Debit Receivable ← Amounts invoiced in the period (right become unconditional) ; Credit Contract asset ← Amounts invoiced in the period (right become unconditional)
Advance received before the transfer
Entry
Debit Cash ← Advance received before the transfer of goods or services ; Credit Contract liability ← Advance received before the transfer of goods or services
Revenue from an obligation satisfied at a point in time, unconditional right
Entry
Debit Receivable ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant ; Credit Revenue ← Revenue from an obligation satisfied at a point in time (share of the price allocated), where relevant
Timing of recognition and modification
JudgmentIFRS 15 §18IFRS 15 §20IFRS 15 §21IFRS 15 §32IFRS 15 §35IFRS 15 §38
Manner in which the obligation is satisfied
JudgmentRequired
Over time: simultaneous receipt and consumption / Over time: asset controlled by the customer / Over time: no alternative use and enforceable right to payment / At a point in time: date of transfer of control according to the indicators
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Accounting for the modification
JudgmentRequired
Separate contract / Termination and new contract (prospective) / Cumulative catch-up adjustment to revenue / Combination of both approaches / No approved modification
Rationale: facts relied on, analysis, alternative rejected
TextRequired
Conclusion
ConclusionTiming of recognition supported, revenue for the period, contract balance at the reporting date and entries
ConclusionRequired
Financial statement impact
FS impactImpact by caption, derived from the entries above (the Notes line refers to the disclosures)
TableRequired
Normative references
ReferencesParagraphs cited in this workpaper (verification status shown from the register)
References