Before signing the contract, Solenne designed a solar farm (location, capacity, panel orientation) that the supplier builds and then operates for it for twenty years, with no substitution right. This design, supplemented by contractual restrictions, predetermines how and for what purpose the farm is used; no relevant decision remains to be made during the period of use. The supplier handles operation and maintenance. Does Solenne have the right to direct the use of the farm?